Tender Details

About Tender

🚧 Invitation For Bids: Ohe Additions And Alterations For Road Over Bridge At Km 626/17 19 🛣️🔧 The Ministry Of Railways, Specifically The Central Govt. Ministry/Department, Is Seeking Bids From Experienced Contractors For The Additions And Alterations To Overhead Equipment (Ohe) In Connection With The Construction Of A Road Over Bridge At Kilometer 626/17 19 Between Slo Medapadu, As Part Of The 4 Lane Highway Project From Samarlakota To Achempeta Junction. This Project Falls Under The Bharatmala Pariyojana And Is Being Executed By The Rail Vikas Nigam Limited (Rvnl). 📅 Bid Submission Deadline: May 02, 2024, 3:00 Pm Earnest Money Deposit (Emd): Inr 5,59,000 Interested Bidders Are Requested To Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Tender Document For The Epc (Engineering, Procurement, And Construction) Mode. Keywords: Vijayawada Division, Ohe, Road Over Bridge, Rvnl, Bharatmala Pariyojana, Nhai, Ministry Of Railways, Epc, Tender, Bid Submission
Particulars Details
Title
Vijayawada Division Additions And Alterations To Ohe In Connection With Proposed Road Over Bridge At Km 626/17 19 Between Slo Medapadu By Rvnl As A Part Of Construction Of 4 Lane Highway From Samarlakota To Achempeta Junction (From Km: 0.00 To 12.250) As Part Of Kakinada Port To Nh 16 Connectivity In The State Of Andhra Pradesh On Epc Mode Under Bharatmala Pariyojana In Connection With Nhai Project. (Deposit Work)
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74396038
Reference
Number
B-E29-TRD-TNDR-02-2024-25
Tender Fee 0
EMD 55900
Tender Value
Place Secunderabad
Link https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74396038/viewNitPdf_4524228.pdf
Start Date April 04, 2024 02:44
End Date

02/05/2024 ( Expired 429 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.

Read more
Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana

Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Read more
Development of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.

Development of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode

Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode

Read more
One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

Read more
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise