Tender Details

Particulars Details
Title
Mrl01 Chewa To Checki Hajin Via Chandergir And Mrl02 Kusumbagh Hakbara To Chandergir Ghat And Mrl01 Nesbal To Asham
Description
Mrl01 Chewa To Checki Hajin Via Chandergir And Mrl02 Kusumbagh Hakbara To Chandergir Ghat And Mrl01 Nesbal To Asham
Organisation National Rural Road Development Agency (NRRDA)
Tender Id 2023_KSRRD_130214_3
Reference
Number
Fresh NIT No.13/EE/PMGSY/Bpr/e-Tendering of 23-24
Tender Fee 600
EMD 5000
Tender Value 0
Place Office Of The Ex. Engineer PMGSY Div Bandipora
Link https://pmgsytenders.gov.in
Start Date December 27, 2023 18:00
End Date

03/01/2024 ( Expired 531 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Road safety works on nh709b epe crossing to of shamli bypass nh334b meerut to haryana border via baghpat nh709ad panipat-shamli-muzaffarnagar in the state of uttar pradesh and haryana

Road safety works on nh709b epe crossing to of shamli bypass nh334b meerut to haryana border via baghpat nh709ad panipat-shamli-muzaffarnagar in the state of uttar pradesh and haryana

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6

Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6

Read more
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6

Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6

Read more
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
Providing and laying of 160mm od hdpe pipeline from lamba line ranchi tekiry command tanks (cwr) to old pahar gaon maa kali workshop to cherian house (via) school line hudco colony, school line junction, school line kirpanand colony, min.......

Providing and laying of 160mm od hdpe pipeline from lamba line ranchi tekiry command tanks (cwr) to old pahar gaon maa kali workshop to cherian house (via) school line hudco colony, school line junction, school line kirpanand colony, min.......

Read more
Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w

Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w

Read more
Construction of road from shaeed nizam ud din kotli to neosi via khor channa and channa to hasote phase-i length 7.50 kms under nabard ridf xxx up to bt status.

Construction of road from shaeed nizam ud din kotli to neosi via khor channa and channa to hasote phase-i length 7.50 kms under nabard ridf xxx up to bt status.

Read more
Wbiw/se/wc-ii/nit-05e/2025-26, sl no. 01.

Protection with strengthening to ex zamindary embankment over left bank of river old cossye in between narajole kheya ghat to ramdaspur (length of work 800 m) at mouza nij narajole and ramdaspur ps daspur block daspur i dist.-paschim medinipur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise