Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Retubing And Repair Of Stator Air Coolers And Generator Bearing Oil Coolers Of Vertical Kaplan Turbines At Mhp Pspcl Talwara
|
| Description |
Retubing And Repair Of 4 No Stator Air Coolers And 6 No Generator Bearing Oil Coolers Of Vertical Kaplan Turbine 19.5 Mw, 167 Rpm Machines At Ph 3 And 4 Of Mhp Talwara.
|
| Organisation | Department of Power | State Govt. and UT |
| Tender Id | 2025_POWER_134182_1 |
|
Reference Number |
16/RE/MHP/2024-25 dated 06/02/2025 |
| Tender Fee | 3581 |
| EMD | 40700 |
| Tender Value | - |
| Place | Talwara |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=271801 |
| Start Date | February 14, 2025 23:30 |
| End Date |
Expired
06/03/2025
Expired 569 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Re-tubing of old and used generator coolers (07 nos. stator air coolers, 04 nos. lgb coolers and 08 nos. ugb coolers)
Re-tubing of old and used generator coolers (07 nos. stator air coolers, 04 nos. lgb coolers and 08 nos. ugb coolers)
Read moreSupply and application of thermal lagging and pipe repair on cooling water regulating system, pipeline of stator air coolers, bearing oil coolers and generator transformer coolers
Supply and application of thermal lagging and pipe repair on cooling water regulating system, pipeline of stator air coolers, bearing oil coolers and generator transformer coolers
Read moreMaterial handling and dismantling, refurbishment and erection and commissioning of vertical kaplan turbine generator and its aux etc at 1x46 mw panchet rmu hep, dvc, jharkhand.
Dismantling of tg, electricals, renovation of embedded parts, material handling, erection, testing, commissioning, trial run and field efficiency test of 1 x 46 mw vertical kaplan turbine-generator along with its auxiliaries, excitation system, cont
Read moreDesign (through reverse engineering), manufacture, shop assembly, testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery of 12 nos. generator stator air coolers for (3x42 mw) larji hep, thalout distt. mandi hp
Design (through reverse engineering), manufacture, shop assembly testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery of 12 nos. generator stator air coolers for (3x42 mw) larji hep, thalout distt. mandi hp
Read moreRectification works, complete rewinding, supervision, testing, and re-commissioning of stator winding of 11kv, 18mw vertical francis turbine driven, lap wound generator of unit no # 2 including the supply of 4nos. nonmagnetic rings at sholayarhep
Rectification works, complete rewinding, supervision, testing, and re-commissioning of stator winding of 11kv, 18mw vertical francis turbine driven, lap wound generator of unit no # 2 including the supply of 4nos nonmagnetic rings at sholayar hep,tsr
Read moreof your Industry type