Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Optical Time Domain Reflectometer (Otdr)
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/3594092 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 21, 2023 20:01 |
| End Date |
Expired
03/07/2023
Expired 1196 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | ANANT VISION TECHNOLOGIES | Make : fibershot Model : (FIBERSHOT LIVE OTDR 45DB | 01-07-2023 13:10:42 | Offline upload | MII | Qualified |
| 2 | STAR TECHNOLOGIES | Make : fibershot Model : (FIBERSHOT LIVE OTDR 45DB | 03-07-2023 13:19:54 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 3 | TELOGICA LIMITED | Make : ATTL FIBER OPTIC--AISHWARYA TECHNOLOGIES AND TELECOM LIMITED Model : ATL-1315F3A | 03-07-2023 14:44:06 | Central / State PSUs | MII N/A | Qualified |
Supply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) im
Supply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) image processing:- auto rebar spacing first rebar layer neighboring rebar correction first layer neighboring rebar correction second layer, (iii) display settings:- concrete cover threshold slider with color palette, (iv) reporting:- instant report generation jpg (screenshot), (v) display unit specs:- screen size: from 7.9 inch to 12.9 inch, resolution : up to 2732-by-2048, memory: up to 02 tb, weight: down to 301 gm/10.6 oz, camera: up to 12 mp wide and 10 mp ultra wide, optional: usb-c, 5g, face id, (vi) display unit sensors:- three – axis gyro, accelerometer, ambient light sensor barometer built -in- gps/gnss (2) instrument. technical specifications:- (i) technology:- eddy-current, (ii) connection:- wireless, (iii) cover measuring depth:- up to 185 mm/7.3in, (iv) cover measuring accuracy:- +/-1 mm/ 0.04 in to 4 mm/ 0.16 in depending on depth , (v) rebar diameter measuring depth:- up to 63 mm/2.5 in, (vi) rebar diameter measuring accuracy:- +/-1 rebar size (possible under optimal conditions. please refer to the manual), (vii) encoder accuracy:- +/-0.5 mm/0.02 in +0.05% of measured length, (viii) max scanning speed:- 0.5 m/s – 1.7 ft/s, (ix) max line scan distance:- 1 km/ 0.6 miles, (x) display:- high-contrast loed screen, (xi) dimensions:-250x130x45 mm / 9.8x5.1x1.8 in (with cart), 190x75x45 mm / 7.5x3.0x1.8 in (without cart) (xii) weight:- 690 gm/ 1.5 ib (with cart), 300 gm / 0.7 ib (without cart), (xiii) battery:- 2x aa(nimh) rechargeable or non rechargeable removable flight-safe, 8 hours autonomy, usb-c power bank (not included)
Read moreSupply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Supply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Read moreComprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.
Comprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.
Read moreOptical time domain reflectometer (otdr)
For complete deion and other details, please refer to tender
Read moreof your Industry type