Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pro.No.205/24 Anganawadi Electrification
|
| Description |
Pro.No.205/24 Anganawadi Electrification Centre No 16, 17, 13
|
| Organisation | Government of Kerala |
| Tender Id | 2023_DP_585652_1 |
|
Reference Number |
S-205/24 |
| Tender Fee | 236 |
| EMD | 2500 |
| Tender Value | - |
| Place | Cherpu GramaPanchayat |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | July 04, 2023 17:30 |
| End Date |
Expired
18/07/2023
Expired 1163 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
The external electrification with under ground cables for hmda layout at sy.nos. 39 and 40 bachupally (v), bachupally (m), medchal-malkajgiri (dist)
The external electrification with under ground cables for hmda layout at sy.nos. 39 and 40 bachupally (v), bachupally (m), medchal-malkajgiri (dist)
Read moreProviding of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Providing of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read morePro.no.200/24- anganawadi electrification
Proj. no. s-200/24- anganawadi electrification- centre no.1,23,28,29
Read morePro.no.203/24- anganawadi electrification
Pro.no.2030/24- anganawadi electrification- centre no - 5, 7, 8
Read moreMoorkanad gp 2023-24 karattuparambu anganawadi mullakkad road improvement (pro.no. 37/24)
Moorkanad gp 2023-24 karattuparambu anganawadi mullakkad road improvement (pro.no.37/24)
Read moreElectrification of various anganawadi
Electrification of various&#x0d anganawadi thirunavaya gpp roj no s0244 24 general electrical work
Read moreElectrification of various anganawadi
Electrification of various anganawadi-thirunavaya gp-proj.no.so244/24-general electrical work
Read moreof your Industry type