Tender Details

Particulars Details
Title
Shifting Of 1 Nos. Of Sd Ls With Complete Electricals From Tilaboni Ug To Ss Pur Ug And Commissioning The Same In Pit No.2 Of Shyamsundarpur Colliery Under Bankola Area
Description
Shifting Of 1 Nos. Of Sd Ls With Complete Electricals From Tilaboni Ug To Ss Pur Ug And Commissioning The Same In Pit No.2 Of Shyamsundarpur Colliery Under Bankola Area
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 6700
Tender Value
Place Shyamsundarpur Colliery
Link

AAAAAAAAAA

Login to view
Start Date July 10, 2025 23:30
End Date

21/07/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including

Read more
Regarding laying a sewer line from in front of house no. 64, sindhu nagar, power house area, up to khatriwala tank and kedar nath apartment, under zone no. 12, ward no. 65.

Regarding laying a sewer line from in front of house no. 64, sindhu nagar, power house area, up to khatriwala tank and kedar nath apartment, under zone no. 12, ward no. 65.

Read more
Regarding laying a new drainage line in place of the damaged line at 14/2 manik bagh and from 1 vijay nagar to 48 vijay nagar, under zone no. 21, ward no. 73.

Regarding laying a new drainage line in place of the damaged line at 14/2 manik bagh and from 1 vijay nagar to 48 vijay nagar, under zone no. 21, ward no. 73.&amp#x0d

Read more
Augmentation of electrical system from lt to ht for girl hostels no. 8, 9, 10,11, international, community centre, boys hostel no.8, emerging area 2, 3 and 4, u.i.a.m.s. and alumni house in pu south campus sector 25 chandigarh h

Augmentation of electrical system from lt to ht for girl hostels no. 8, 9, 10,11, international, community centre, boys hostel no.8, emerging area 2, 3 and 4, u.i.a.m.s. and alumni house in pu south campus sector 25 chandigarh

Read more
Supply and installation of 01 no of power board having of 2 no of switch socket 01 no of 20 watt led tube light with complete fitting in 317 number at new rosaline to convert rooms in triple seated accommodation and replacement of18 w led

Supply and installation of 01 no of power board having of 2 no of switch socket 01 no of 20 watt led tube light with complete fitting in 317 number at new rosaline to convert rooms in triple seated accommodation and replacement of18 w led

Read more
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation in connection to accommodate fhtc at p.h. no.-i ii at kulgachhi ground water based w/s scheme under block_ teh

Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation in connection to accommodate fhtc at p.h. no.-i ii at kulgachhi ground water based w/s scheme under block_ teh

Read more
Supply, installation and commissioning 2 nos. of ro plants including all accessories with camc for a period of 3 years after completion of warranty period

Supply, installation and commissioning of 2 nos. ro plants of 1000 lph capacity including all accessories with a warranty period of one year from the date of commissioning of ro plants and comprehensive maintenance contract for a period of 3 years after completion of warranty period at kanukur and gudipalli villages in srp area

Read more
Laying of 33 kv xlpe 3cx400 sqmm ug cable from proposed beledurganagar gordwoani 132 33 11 kv gss to manirtat 33 11 kv sub stn of ckt 1 rl 1.685 km and for ckt 2 rl 1.270 km at different location under joynagar division

Laying of 33 kv xlpe 3cx400 sqmm ug cable from proposed beledurganagar gordwoani 132 33 11 kv gss to manirtat 33 11 kv sub stn of ckt 1 rl 1.685 km and for ckt 2 rl 1.270 km at different location under joynagar division

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise