Tender Details
Particulars | Details |
---|---|
Title |
Construction Of High Level Bridge Over Mangechapri Sukhnar River In Between Babudih Pmgsy Via Nirudih
|
Description |
Construction Of High Level Bridge Over Mangechapri Sukhnar River In Between Babudih Pmgsy Via Nirudih
|
Organisation | National Rural Road Development Agency (NRRDA) |
Tender Id | 2023_ECBIH_128037_1 |
Reference Number |
STATE SCHEME-23-JHAJHA-04 |
Tender Fee | 10000 |
EMD | 11.55 Lakh |
Tender Value | |
Place | RWD PATNA |
Link | https://pmgsytenders.gov.in |
Start Date | September 09, 2023 21:30 |
End Date |
15/09/2023 ( Expired 633 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreExpression of interest (eoi) from reputed contractors having experience in expressway/ highway/ irrigation/ railway/ metro/ high speed rail/ power sector india/ overseas
Expression of interest (eoi) from reputed 
 contractors having experience in expressway/ 
 highway/ irrigation/ railway/ metro/ high speed
 rail/ power sector india/ overseas
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConstruction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Read moreDesign and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreDesign, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp
Design, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp
Read moreof your Industry type