Tender Details

Particulars Details
Title
Twin Tower Air Dryer With Precoolescer And Final Filter For 3 Phase Electric Locomotives.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106400460
Reference
Number
03240141
Tender Fee 0
EMD 0
Tender Value
Place Hazipur
Link https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106594868/viewNitPdf_4858923.pdf
Start Date February 06, 2025 21:57
End Date

21/02/2025 ( Expired 114 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Phase-2 - driver and final stage amplifiers for 2 sets of

Phase-2 - driver and final stage amplifiers for 2 sets of&#x0d iter icrf sources

Read more
Jp/b862-000-pf-t-4350/1018 - compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)

Compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)

Read more
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi

For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi

Read more
Package-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp

Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun

Read more
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Read more
Dnit for laying of tower foundations,erection of towers,stringing and sagging of conductor for 220 kv line from 400 kv nakodar to railway traction sub station nakodar 2 phase railway supply (contributory work)

Dnit for laying of tower foundations,erection of towers,stringing and sagging of conductor for 220 kv line from 400 kv nakodar to railway traction sub station nakodar 2 phase railway supply (contributory work)

Read more
Provn of compound wall with gate and watch tower in 4032 sq mtr (01 acre) land for radar station at suhelipar island under dhq-12 kavaratti under ge (navy) lakshadweep

Provn of compound wall with gate and watch tower in 4032 sq mtr (01 acre) land for radar station at suhelipar island under dhq-12 kavaratti under ge (navy) lakshadweep

Read more
Supply of topographical equipments for hiu, wrd under airbmp lot 3 supply of waterproof and handheld gps with accessories for hiu, wrd under airbmp

Supply of topographical equipments for hiu, wrd under airbmp&amp#x0d lot 3 supply of waterproof and handheld gps with accessories for hiu, wrd under airbmp

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise