Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Cooling Water Pipelines Of Unit 1 Machine With Seamless Carbon Steel Pipes At Idamalayar Power House Including Dismantling Of Existing Pipelines Supply Fabrication Erection Installation Testing Commissioning
|
| Description |
Replacement Of Cooling Water Pipelines Of Unit 1 Machine With Seamless Carbon Steel Pipes At Idamalayar Power House Including Dismantling Of Existing Pipelines Supply Fabrication Erection Installation Testing Commissioning
|
| Organisation | Kerala State Electricity Board | Chief Engineer Generation Moolamattom | Deputy Chief Engineer Gen Circle Kothamangalam | EE Gen Division Edamalayar |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5900 |
| EMD | 34200 |
| Tender Value | 13.68 Lakh |
| Place | Kerala |
| Link | Login to view |
| Start Date | October 01, 2026 20:30 |
| End Date |
Closing soon
16/10/2026
3 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair replacement of distribution pipe lines gi ms with seamless high carbon steel pipes of various sizes including fittings and certain other allied works at kasauli under ge kasauli
Repair replacement of distribution pipe lines gi ms with seamless high carbon steel pipes of various sizes including fittings and certain other allied works at kasauli under ge kasauli
Read moreRepair replacement of distribution pipe lines gi ms with seamless high carbon steel pipes of various sizes including fittings and certain other allied works at dagshai under ge kasauli
Repair replacement of distribution pipe lines gi ms with seamless high carbon steel pipes of various sizes including fittings and certain other allied works at dagshai under ge kasauli
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreRepair replacement gi ms with seamless high carbon steel pipes of various sizes, all types of valves, valve pits, chambers water tanks and other misc connected work for rcc, north spring and south spring area at kasauli under ge kasauli
Repair replacement gi ms with seamless high carbon steel pipes of various sizes, all types of valves, valve pits, chambers water tanks and other misc connected work for rcc, north spring and south spring area at kasauli under ge kasauli
Read moreShifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,
(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn
Read moreDismantling and erection cum re arrangement of the 10 inch dia m.s. pipes along with other miscellaneous jobs, needed for shifting of the 2500 g.p.m. kirloskar make pump, in operation at the deep mine zone at r.o.c.p. mine under rajmahal area
Dismantling and erection cum re arrangement of the 10 inch dia m.s. pipes along with other miscellaneous jobs, needed for shifting of the 2500 g.p.m. kirloskar make pump, in operation at the deep mine zone at r.o.c.p. mine under rajmahal area
Read moreRepair, strengthening, fabracation and replacement of damaged,repair, strengthening, fabracation and replacement,fabrication and installation of cable tray support system,foundation repair and cement plastering works for all antenna,dismantling and refixing of existing maintenance platform of 13 mtr towers,dismantling and refixing of existing maintenance platform of 25 mtr towers,repaired structure shall be provided with 02 coats of red oxide zinc chromate primer
Repair, strengthening, fabracation and replacement of damaged,repair, strengthening, fabracation and replacement,fabrication and installation of cable tray support system,foundation repair and cement plastering works for all antenna,dismantling and refixing of existing maintenance platform of 13 mtr towers,dismantling and refixing of existing maintenance platform of 25 mtr towers,repaired structure shall be provided with 02 coats of red oxide zinc chromate primer
Read moreEstablishing 2x20mva, 110/11kv ss at allur k and construction of 110kv lilo line using lynx conductor from existing 110kv nalwar-yagapur line to the proposed 110/11kv allur k ss for a distance of 18.108km in chittapura tq kalaburagi dst on ptk basis including supply of all matching materials/equipments (excl 11kv swg) and erection (incl dismantling and civil works) of all materials/ equipment, t&c
Establishing 2x20mva, 110/11kv ss at allur k and construction of 110kv lilo line using lynx conductor from existing 110kv nalwar-yagapur line to the proposed 110/11kv allur k ss for a distance of 18.108km in chittapura tq kalaburagi dst on ptk basis including supply of all matching materials/equipments (excl 11kv swg) and erection (incl dismantling and civil works) of all materials/ equipment, t&c
Read moreEstablishment of 2x20mva, 110/11kv sub-station at kannalli along with construction of 110kv lilo line using lynx conductor from existing 110kv kembhavi-hunasagi sc line to the proposed 110/11kv kannalli sub-station for a distance of 10.685km in hunasagi taluk, yadgir district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning.
Establishment of 2x20mva, 110/11kv sub-station at kannalli along with construction of 110kv lilo line using lynx conductor from existing 110kv kembhavi-hunasagi sc line to the proposed 110/11kv kannalli sub-station for a distance of 10.685km in hunasagi taluk, yadgir district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning.
Read moreReplacement of cooling water outlet pipelines with seamless carbon steel pipes and ugb cw pipes with seamless stainless steel pipes at idamalayar power house, including dismantling, supply, fabrication, erection, installation, testing, commissioning
Replacement of cooling water outlet pipelines with seamless carbon steel pipes and ugb cw pipes with seamless stainless steel pipes at idamalayar power house, including dismantling, supply, fabrication, erection, installation, testing, commissioning
Read moreof your Industry type