Tender Details

Particulars Details
Title
Construction Of Protective Bandh To Protect The Agriculture Fields In Sy. No. 73 33, Sy. No. 73 34 And Sy. No. 73 35 At Baradi In Village Velim In Velim Constituency Of Salcete Taluka.
Description
Construction Of Protective Bandh To Protect The Agriculture Fields In Sy. No. 73 33, Sy. No. 73 34 And Sy. No. 73 35 At Baradi In Village Velim In Velim Constituency Of Salcete Taluka.
Organisation Government of Goa
Tender Id 2023_WRD_10471_1
Reference
Number
WDII/TECH/F17/17e/2023-24/SN1
Tender Fee 3000
EMD 46980
Tender Value
Place Rawanfond
Link https://eprocure.goa.gov.in
Start Date August 09, 2023 20:30
End Date

07/09/2023 ( Expired 656 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of 33kv line from no 11 tarajan rob to jonai dss

Construction of 33kv line from no 11 tarajan rob to jonai dss apdcl via lakhi napali village under jonai esd 4.5 ckm along with construction of 33kv terminal bay at jonai dss of apdcl and construction of 33kv ug highway crossing at no 2 torajan

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Construction work of bituminous road at kajal talkies to ramdas ghati and bhains mandi pull to pardi mohalla ward 34. file no. 08/24x3/5.

Construction work of bituminous road at kajal talkies to ramdas ghati and bhains mandi pull to pardi mohalla ward 34. file no. 08/24x3/5.

Read more
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6

Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6

Read more
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Read more
Ge (n) p/token - 22 of 2025-2026 spe rep of roof and various allied services related to br and em at air house (bldg no 8a victoria rd) and construction of security wall for officers md accn at pope rd in the area of age br (e) under ge (n) pune

Ge (n) p/token - 22 of 2025-2026 spe rep of roof and various allied services related to br and em at air house (bldg no 8a victoria rd) and construction of security wall for officers md accn at pope rd in the area of age br (e) under ge (n) pune

Read more
Construction of atal path in village 2 sgm from mehandipur balaji temple to krishna temple via verma kiryana store and bajigar chauraha at km. 0/0 to 1/100

Construction of atal path in village 2 sgm from mehandipur balaji temple to&amp#x0d krishna temple via verma kiryana store and bajigar chauraha at km. 0/0 to 1/100

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise