Tender Details

Particulars Details
Title
Supply Of Steam Supply And Condensate Recovery Manifolds
Description
Design, Engineering Manufacturing, Procurement Of Materials, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Steam Supply And Condensate Recovery Manifolds
Organisation IndianOil | Central Govt. Ministry/Department
Tender Id 2025_REFHQ_185908_1
Reference
Number
TP/077154C001/000/1392-601/399
Tender Fee 0
EMD 0
Tender Value -
Place IOCL, Gujarat Refinery
Link
View Original Tender Notice

https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196170

Start Date July 31, 2025 20:30
End Date
Expired 16/08/2025

Expired 421 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit

Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit

Read more
Supply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system

Supply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system

Read more
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Read more
Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the ganga river corridor in bihar.

Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the ganga river corridor in bihar.

Read more
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the kosi and gandak river corridor in bihar.

Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the kosi and gandak river corridor in bihar.

Read more
Design, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s

Design, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria

Read more
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years

Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise