Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Of Pwd From Fultali Madhupur Road (L 3 Point 50 Km) Under Amtali Pwd (Rn B) Sub Division During The Year 2025 26 Sh Patch Repairing, Patch Carpeting, Premix Seal Coat, Sand Seal Coat And Construction Of Pucca Drain Etc
|
Description |
Maintenance Of Pwd From Fultali Madhupur Road (L 3 Point 50 Km) Under Amtali Pwd (Rn B) Sub Division During The Year 2025 26 Sh Patch Repairing, Patch Carpeting, Premix Seal Coat, Sand Seal Coat And Construction Of Pucca Drain Etc
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_58779_1 |
Reference Number |
89_R_EE_BSLD_PWD(RnB)_2024_25 |
Tender Fee | 1000 |
EMD | 47052 |
Tender Value | |
Place | Madhupur Fultali |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=59780 |
Start Date | February 25, 2025 00:00 |
End Date |
17/03/2025 ( Expired 85 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreNagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreMtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Read moreMtc. of road from jolaibari kowaifung road to gurma colony (ch- 3.20 to 4.30 km)
Sh-metaling, grouting, re-carpeting, tack coat, seal coat, surface drain etc. during the year 2025-26. (gr-i)
Read moreMtc. of road from nh-08 to achaichi mog para (mla para)(ch 0.00 to 1.50 km)
Sh-metaling, grouting, re-carpeting, tack coat, seal coat, surface drain etc. during the year 2025-26.
Read moreMtc. of road from debdaru kalshi road to patichari (ch- 0.00 to 1.30 km)
Sh-metaling, grouting, re-carpeting, tack coat, seal coat, surface drain etc. during the year 2025-26.
Read moreMtc. of road from jolaibari kowaifung road to rangacherra (ch- 1.20 to 2.407 km)
Sh-metaling, grouting, re-carpeting, tack coat, seal coat, surface drain etc. during the year 2025-26.
Read moreRunning maintenance of jjm / nrdwp/ rws / ridf schemes at jampui hill
Repairing mtc. of existing gi/di pipe lines under dws sub-division, kanchanpur under jampui hill rd block areas during the year 2025-26
Read moreNecessary repairing works to seepage from outside periphery at basement and reconstruction of damaged sewer-line at ground floor of civil defense building situated at 81/2/2 phears lane, kol-700012, under city division, pwd, during the year 2025
Necessary repairing works to seepage from outside periphery at basement and reconstruction of damaged sewer-line at ground floor of civil defense building situated at 81/2/2 phears lane, kol-700012, under city division, pwd, during the year 2025
Read moreCarrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Carrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Read moreof your Industry type