Tender Details
About Tender
🛣️ Invitation For Bids: Design And Construction Of Vup At Ibadpada Sutrakar Phata 🏗️ The National Highways Authority Of India (Nhai), Under The Public Sector Undertakings, Is Seeking Bids From Experienced Contractors For The Design And Construction Of A Vertical Undertaking (Vup) At Ibadpada Sutrakar Phata, Ch 392+500, On The Surat Dahisar Section Of Nh 48 In Maharashtra. This Project Is Aimed At Rectifying A Ministry Of Road Transport And Highways (Mo Rth) Identified Blackspot, Blackspot Id Mh 05 20. 📅 Bid Submission Deadline: April 4, 2024, 11:00 Am Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 44,79,000 The Project Will Be Executed On An Engineering, Procurement, And Construction (Epc) Mode. Interested Bidders Must Submit Detailed Proposals, Including Design Specifications, Construction Methodology, And Financial Bids, In Accordance With The Tender Documents. Keywords: Nhai, Vup, Design And Construction, Blackspot Rectification, Epc Mode, Road Infrastructure, Government Tender, Maharashtra, Earnest Money Deposit, Tender FeeParticulars | Details |
---|---|
Title |
Design And Construction Of Vup Along With Its Allied Works For Rectification Of Mo Rth Identified Blackspot Blackspot Id Mh 05 20 At Ibadpada Sutrakar Phata Ch 392 500 On Surat Dahisar Section Of Nh 48 In The State Of Maharashtra On Epc Mode
|
Description |
Design And Construction Of Vup Along With Its Allied Works For Rectification Of Mo Rth Identified Blackspot Blackspot Id Mh 05 20 At Ibadpada Sutrakar Phata Ch 392 500 On Surat Dahisar Section Of Nh 48 In The State Of Maharashtra On Epc Mode
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_191766_1 |
Reference Number |
NHAI/RO/MUM/Thane/SD/BS/20 |
Tender Fee | 10000 |
EMD | 44.79 Lakh |
Tender Value | |
Place | Thane |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=210025 |
Start Date | March 16, 2024 23:30 |
End Date |
04/04/2024 ( Expired 415 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost
Rehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode
Rectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode
Read moreRectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Rectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreof your Industry type