Tender Details

Particulars Details
Title
Construction Of Cement Nalla Bandhara Kotluk No.2
Description
Construction Of Cement Nalla Bandhara Kotluk
Organisation CE Small Scale Irrigation (WC) Pune | State Govt. and UT
Tender Id 2025_SSIP_1241154_1
Reference
Number
E-Tender Notice No.B-1/ 13 for the Year 2025-26
Tender Fee 2860
EMD 40000
Tender Value
Place KOTLUK
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2141218

Start Date November 06, 2025 19:35
End Date
Expired 13/11/2025

Expired 252 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2

Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&amp#x0d

Read more
Licensing of co-branding and inside advertising rights of nine no. metro stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in upmrc network.

Licensing of co-branding and inside advertising rights of nine no. metro &#x0d stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in &#x0d upmrc network.

Read more
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Read more
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works

Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works

Read more
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.

Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based&#x0d maintenance contract in the state of uttar pradesh.

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise