I. Modification Of 11 Kv Ht ,440 V And 230 V Lt And 33 Kv Ht Overhead Power Line Crossings By Ug Cable In Non Epc Section Of Talkal Wadi New Bg Line. Ii. Electrification Of Station Building &Amp Service Building At Budhagumpa And Chikabenakal , Platforms At Karatgi Railway Station &Amp Shifting/Modification Of Ht 11 Kv And Lt Powerline Crossings, Lighting Arrangement At Rob In Lieu Of Lc 102 At Kudatini. Iii. Power Supply Arrangement At Ugarkhurd And Electrification Of Covered Platform And Fob
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 76724017
Reference
Number
ECN-08-2024
Tender Fee 0
EMD 2.67 Lakh
Tender Value
Place Hubli
Link https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76724017/viewNitPdf_4673273.pdf
Start Date August 22, 2024 22:22
End Date

16/09/2024 ( Expired 218 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.

Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.

Read more
Supply, installation, testing and commissioning for construction of 11 kv line, construction of lt line and creation sub- station for providing power supply to army medical base camp at hundurman kargil

Supply, installation, testing and commissioning for construction of &amp#x0d 11 kv line, construction of lt line and creation sub- stations &amp#x0d for providing power supply to army medical base camp at &amp#x0d hundurman kargil

Read more
Wc-4125-b-making temporary bypass arrangement for ht (33kv and 11kv) and lt (415v) line crossings during stringing of 765kv bidar-maheshwaram d/c transmission line tl02

Wc-4125-b-making temporary bypass arrangement for ht (33kv and 11kv) and lt (415v) line crossings during stringing of 765kv bidar-maheshwaram d/c transmission line tl02

Read more
Wc-4125-a-making temporary bypass arrangement for ht (33kv and 11kv) and lt (415v) line crossings during stringing of 765kv bidar-maheshwaram d/c transmission line tl01

Wc-4125-a-making temporary bypass arrangement for ht (33kv and 11kv) and lt (415v) line crossings during stringing of 765kv bidar-maheshwaram d/c transmission line tl01

Read more
Wc-4124-b-making temporary bypass arrangement for ht 33kv and 11kv and lt 415v line crossings during stringing of 765kv koppal-ii ps - raichur dc transmission line (tl02)

Making temporary bypass arrangement for ht 33kv and 11kv and lt 415v line crossings during stringing of 765kv koppal-ii ps - raichur dc transmission line (tl02)

Read more
Wc-4124-a-making temporary bypass arrangement for ht 33kv and 11kv and lt 415v line crossings during stringing of 765kv koppal-ii ps - raichur dc transmission line (tl01)

Making temporary bypass arrangement for ht 33kv and 11kv and lt 415v line crossings during stringing of 765kv koppal-ii ps - raichur dc transmission line (tl01)

Read more
Supply, erection and commissioning of 250 kva at smart city office building, kirlampudi - visakahapatnam to convert apepdcl connection from lt to ht power supply

Supply, erection and commissioning of 250 kva at smart city office building, kirlampudi - visakahapatnam to convert apepdcl connection from lt to ht power supply

Read more
Selection of agency for external and internal electrification work of ht/lt line and transformer, line shifting at various places in abd area and pan city area as per requirements for projects of indore smart city development limited, phase -5

Selection of agency for external and internal electrification work of ht/lt line and transformer, line shifting at various places in abd area and pan city area as per requirements for projects of indore smart city development limited, phase -5

Read more
Extension of new ht/lt line by 200kva and 100kva sub-station with 11kv covered conductor 1cx70mm2 to give three phase service connection to water innovative source and a water boosting station at tapsa para

Extension of new ht/lt line by 200kva and 100kva sub-station with 11kv covered conductor 1cx70mm2 to give three phase service connection to water innovative source and a water boosting station at tapsa para

Read more
Extension of ht/lt line at dm coloney

Installation of new 11kv feeder (vip feeder) and extension of ht/lt line i/c construction of 2x200kva sub-station for providing 3phase, 4 wire new service connection to newly constructed vip complex building at dhalabil colony under ed khowai