Tender Details

Particulars Details
Title
Cleaning The Spill Over Materials Of Iron Ore Fines From The Existing Paved Road Surface And Cleaning The Drain In Mdl Yard For The Year 2023 24
Description
Cleaning The Spill Over Materials Of Iron Ore Fines From The Existing Paved Road Surface And Cleaning The Drain In Mdl Yard For The Year 2023 24
Organisation Central Public Procurement Portal 1
Tender Id 2023_NMPT_760061_1
Reference
Number
CIVIL/CE(C)/EE(C)/08/2023-24
Tender Fee 560
EMD 1.11 Lakh
Tender Value -
Place Office of the Executive Engineer NMPA Panambur
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date August 14, 2023 15:30
End Date
Expired 21/08/2023

Expired 1155 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Proposed construction of shed over existing open otta no. 6 at main market yard samudrapurr.

Proposed construction of shed over existing open otta no. 6 at main market yard samudrapurr.

Read more
Tc for repairing and re-carpeting of cf roads with 40 mm thick sdbc 60-70 grade bitumen over existing road surface (based on m.o.r.t and h.specification)

Tc for repairing and re-carpeting of cf roads with 40 mm thick sdbc 60-70 grade bitumen over existing road surface (based on m.o.r.t and h.specification)

Read more
The work of repair and maintenance (bituminous carpeting over damaged surface) of existing road from ambedkar chowk to sr. wings dav, corner of shopping centre to kadam tree chowk and gandhi chowk to durga mandir (d-type) at ttps, lalpania

The work of repair and maintenance (bituminous carpeting over damaged surface) of existing road from ambedkar chowk to sr. wings dav, corner of shopping centre to kadam tree chowk and gandhi chowk to durga mandir (d-type) at ttps, lalpania

Read more
(i) dhapdhapi (dpdp) yard remodeling. (ii) at nischindapur: provision of over run-line (120 m) & extension of existing loop line at nischindapur. (iii) at baruipur: repairs to damaged station approach area including road connected to lc gates in side railway premises with all other ancillary works under assistant engineer/baruipur.

(i) dhapdhapi (dpdp) yard remodeling. (ii) at nischindapur: provision of over run-line (120 m) & extension of existing loop line at nischindapur. (iii) at baruipur: repairs to damaged station approach area including road connected to lc gates in side railway premises with all other ancillary works under assistant engineer/baruipur.

Read more
Sitc of 250kva capacity continuous loading outdoor copper wound transformer,provisioning steel tubular pole,erection of steel tubular,brick work with common burnt clay,pdg 15 mm cement plaster,supplying and installaton m.s. cable trays,earthing with g.i. earth plate,providing and fixing g.i. pipe,providing and fixing g.i. strip,supplying and erection of 11 kv triple pole,supplying and erection of two lengths of channel iron,supplying and erection of 11 kv pin insulator,supplying and erection of 11 kv disc insulator,supplying and erection of lightning arrestor,pdg and fixing abc cable,pdg and fixing aluminium ht cables,pdg and fixing shrinkable ht cable,supply of following aluminium conductor armoured cable,supply gland and aluminium lugs,laying of one number xlpe power cable,in the existing masonry,on surface,on cable tray,pdg and fixing fencing,supply fixing fire extinguisher,pdg 6mtr length b class gi pipe pole,erection of metallic pole

Sitc of 250kva capacity continuous loading outdoor copper wound transformer,provisioning steel tubular pole,erection of steel tubular,brick work with common burnt clay,pdg 15 mm cement plaster,supplying and installaton m.s. cable trays,earthing with g.i. earth plate,providing and fixing g.i. pipe,providing and fixing g.i. strip,supplying and erection of 11 kv triple pole,supplying and erection of two lengths of channel iron,supplying and erection of 11 kv pin insulator,supplying and erection of 11 kv disc insulator,supplying and erection of lightning arrestor,pdg and fixing abc cable,pdg and fixing aluminium ht cables,pdg and fixing shrinkable ht cable,supply of following aluminium conductor armoured cable,supply gland and aluminium lugs,laying of one number xlpe power cable,in the existing masonry,on surface,on cable tray,pdg and fixing fencing,supply fixing fire extinguisher,pdg 6mtr length b class gi pipe pole,erection of metallic pole

Read more
Cleaning the spill over the materials of iron ore fines from the existing paved roads surface and cleaning the drain in mdl yard area for the year 2024-25

Cleaning the spill over the materials of iron ore fines from the existing paved roads surface and cleaning the drain in mdl yard area for the year 2024-25

Read more
Cleaning the spill over materials of iron ore fines from the existing paved road surface and cleaning the drain in mdl yard for the year 2023-24-re tender

Cleaning the spill over materials of iron ore fines from the existing paved road surface and cleaning the drain in mdl yard for the year 2023-24-re tender

Read more
Unloading of iron ore fines iron ore slime coal at rmhp coking coal yard

Unloading of iron ore fines iron ore slime coal at rmhp coking coal yard

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise