Tender Details
Particulars | Details |
---|---|
Title |
Improvement To Road Poladpur Katetali Nagaon Road Mdr 68 Km 0/00 To 7/500 (Construction Of Retaining Wall) Tal Poladpur Dist Raigad
|
Description |
Improvement To Road Poladpur Katetali Nagaon Road Mdr 68 Km 0/00 To 7/500 (Construction Of Retaining Wall) Tal Poladpur Dist Raigad
|
Organisation | Government of Maharashtra |
Tender Id | 2023_PWR_976347_1 |
Reference Number |
Notice 108 No/AB/Ten/5898 Dt 28/12/2023 |
Tender Fee | 1180 |
EMD | 1.5 Lakh |
Tender Value | |
Place | S.E.Raigad (P.W.) Circle, Kokan Bhavan Navi Mumbai |
Link | https://mahatenders.gov.in |
Start Date | January 01, 2024 15:30 |
End Date |
15/01/2024 ( Expired 511 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Construction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreImprovement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Construction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Read moreConstruction of atal path from newra road-gopasariya road to ladaniyo ki dhani via deramnagar adhuni dhani school km.0/0 to 2/500 (village newra road) package no -rj-21-ap-25-26-03
Construction of atal path from newra road-gopasariya road to ladaniyo ki dhani via deramnagar adhuni dhani school km.0/0 to 2/500 (village newra road) package no -rj-21-ap-25-26-03
Read moreConstruction of retaining wall on both side rapat road mandir to palace road makbara under s.d.m.f.scheme.
Construction of retaining wall on both side rapat road mandir to palace road makbara under s.d.m.f.scheme.
Read moreof your Industry type