Tender Details

Particulars Details
Title
Deposit Work Of Thiruvananthapuram Corporation Proposal For 100 Percentage Coverage In All Wards Under Ww Section Pattoor Providing Fht Cs At Vettukad Ward In Thiruvananthapuram Corporation
Description
Deposit Work Of Thiruvananthapuram Corporation Proposal For 100 Percentage Coverage In All Wards Under Ww Section Pattoor Providing Fht Cs At Vettukad Ward In Thiruvananthapuram Corporation
Organisation Kerala Water Authority | State Govt. and UT
Tender Id 2025_KWA_747365_1
Reference
Number
WRD/KWA-CE(SR)/TR/3773/2025
Tender Fee 2760
EMD 50000
Tender Value
Place vettukad
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1207461
Start Date March 07, 2025 14:30
End Date

14/03/2025 ( Expired 64 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)

Construction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)

Read more
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state

Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state

Read more
Cement concrete work with maintaining level to main road in place of damaged road on harijan mohalla at arandiya village in ward no. 36 under zone no. 22

Cement concrete work with maintaining level to main road in place of damaged road on harijan mohalla at arandiya village in ward no. 36 under zone no. 22

Read more
Construction work of c.c. road and drain in various wards under municipal corporation area

Construction work of c.c. road and drain in various wards under municipal corporation area

Read more
Supply of isi mark stable bleaching powder grade -1 is-1065 -2019,33-34 percentage in hdpe bags including transportation , loading and unloading at all municipal corporation water treatment plant in jabalpur.

Supply of isi mark stable bleaching powder grade -1 is-1065 -2019,33-34 percentage in hdpe bags including transportation , loading and unloading at all municipal corporation water treatment plant in jabalpur.

Read more
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Read more
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state

Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state

Read more
Service contract for cleaning of all cable tray lines by air at in side and out side power house areas during u-5 oh under emiph and emoph, stps.

Service contract for cleaning of all cable tray lines by air at in side and out side power house areas during u-5 oh under emiph and emoph, stps.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise