Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Authority Engineer For Jhansi Link Expressway
|
| Description |
Consultancy Services For Authority Engineer For Supervision Of Development Of Greenfield Access Controlled Jhansi Link Expressway 6 Lane Expandable To 8 Lane Project In The State Of Uttar Pradesh On Epc Mode
|
| Organisation | U.P. Expressways Industrial Development Authority |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 11800 |
| EMD | 10 Lakh |
| Tender Value | - |
| Place | Uttar Pradesh |
| Link | Login to view |
| Start Date | October 01, 2026 17:30 |
| End Date |
Closing soon
16/10/2026
3 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Authority engineer for ale_pe link expressway
Consultancy services for authority engineer for supervision of development of greenfield access controlled agra lucknow expressway to purvanchal expressway link expressway 6 lane expandable to 8 lane project in the state of uttar pradesh on epc
Read moreConstruction of 10 type-3 residential units at the public works department, jhansi, in district jhansi
Construction of 10 type-3 residential units at the public works department, jhansi, in district jhansi
Read moreD/o expressway (providing and erecting w metal beam crash barrier on both side of noida-greater noida expressway service road from ch. 0.00km to 10.00km) noida
D/o expressway (providing and erecting w metal beam crash barrier on both side of noida-greater noida expressway service road from ch. 0.00km to 10.00km) noida
Read moreOperation and maintenance of food kiosk of package viii of purvanchal expressway
Selection of an agency for operation and maintenance of food kiosk at package viii of purvanchal expressway at chainage 315.900 km lhs
Read moreDevelopment of integrated manufacturing and logistics clusters at ambedkar nagar gorakhpur link expressway with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Development of integrated manufacturing and logistics clusters at ambedkar nagar gorakhpur link expressway with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Read moreConstruction expressway to mandapada via b.c plant road for the year 2026-27
Construction expressway to mandapada via b.c plant road for the year 2026-27
Read moreIe services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Ie services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Read moreBalance work for construction of 8-lane access-controlled expressway from km 154.6 to km 190.0 of vadodara mumbai expressway (jujuwa to gandeva section) in gujarat on epc mode (pkg-viii)-02nd call
Balance work for construction of 8-lane access-controlled expressway from km 154.6 to km 190.0 of vadodara mumbai expressway (jujuwa to gandeva section) in gujarat on epc mode (pkg-viii)-02nd call
Read moreDevelopment or construction of entry exit arrangement at 4 lane greenfield expressway spur from delhi vadodara greenfield expressway near bandikui to jaipur section of ne 4c in the state of rajasthan on epc mode.
Development or construction of entry exit arrangement at 4 lane greenfield expressway spur from delhi vadodara greenfield expressway near bandikui to jaipur section of ne 4c in the state of rajasthan on epc mode.
Read moreof your Industry type