Tender Details
Particulars | Details |
---|---|
Title |
Installation Of 01 No. Of 800 Mm Size Double Drive Drum With Loop Take Up And 04 No. Of 1000 Mm Belt Structure And Pvc Belt In (F2 And F3) Depillaring Panel At Rajgamar 4and5 Incline Of Rajgamar Sub Area.
|
Description |
Installation Of 01 No. Of 800 Mm Size Double Drive Drum With Loop Take Up And 04 No. Of 1000 Mm Belt Structure And Pvc Belt In (F2 And F3) Depillaring Panel At Rajgamar 4 And5 Incline Of Rajgamar Sub Area.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_SECL_286123_1 |
Reference Number |
SECL/KB/GM/SO(M)/eNIT/23-24/19 |
Tender Fee | |
EMD | 20900 |
Tender Value | |
Place | Office of the General Manager Korba Area Post and |
Link | https://coalindiatenders.nic.in |
Start Date | August 16, 2023 16:30 |
End Date |
26/08/2023 ( Expired 648 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Repairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreLoading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.
Loading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.
Read moreA)repairing of take-up drum size 1600 x 1000 x 10mm including making of its structure of 949 belt conveyor in rlb section of kathara washery b)repairing and thorough overhauling of gear box (gs-14b) of unit no. 954 belt conveyor at rlb section of kat
A)repairing of take-up drum size 1600 x 1000 x 10mm including making of its structure of 949 belt conveyor in rlb section of kathara washery b)repairing and thorough overhauling of gear box (gs-14b) of unit no. 954 belt conveyor at rlb section of kat
Read moreRepairing by new change of m.s cell of drive and driving conveyor drum for 102 belt(drum size od630mm, cell length-1600mm and cell thickness-16mm,qty.-02nos.)of vertical section of moonidih project.sl.no.cp102/mnd/01 and cp102/mnd/02
Repairing by new change of m.s cell of drive and driving conveyor drum for 102 belt(drum size od630mm, cell length-1600mm and cell thickness-16mm,qty.-02nos.)of vertical section of moonidih project.sl.no.cp102/mnd/01 and cp102/mnd/02
Read moreReplacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery
Replacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery
Read moreMaking of 02 nos foundation for installation of drive head with loop take up and loading, unloading, transportation, extension of for total length 2704 mtr and dismantling of existing belt structure and pvc belt at bartarai ug mine.
Making of 02 nos foundation for installation of drive head with loop take up and loading, unloading, transportation, extension of for total length 2704 mtr and dismantling of existing belt structure and pvc belt at bartarai ug mine.
Read moreDismantling, transportation and installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. -6d,
Dismantling, transportation and installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. -6d,
Read moreComplete repairing of 02 nos. take-up pulley of size dia 800x1400mm of unit no. 133b and 116a belt conveyor of pre-washery at kedla washery.
Complete repairing of 02 nos. take-up pulley of size dia 800x1400mm of unit no. 133b and 116a belt conveyor of pre-washery at kedla washery.
Read moreRepairing by new change of shaft of tailend conveyor drum for 101 belt (drum size- od 800mm, cell length 1600mm and cell thickness 14mm) of vertical section of moonidih project. sl.no.cd/101/01
Repairing by new change of 
 shaft of tailend conveyor 
 drum for 101 belt (drum 
 size- od 800mm, cell length
 1600mm and cell thickness
 14mm) of vertical section of 
 moonidih project. 
 sl.no.cd/101/01
Read moreof your Industry type