Tender Details
Particulars | Details |
---|---|
Title |
Const Of Street From House Mahesh To Rajesh To Jagan ,Rajesg To Pappu , Billu To Bishamber In Ward No 9 Mc Sohna
|
Description |
Const Of Street From House Mahesh To Rajesh To Jagan ,Rajesg To Pappu , Billu To Bishamber In Ward No 9 Mc Sohna
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_298435_1 |
Reference Number |
202339539081 B7A3 45C4 AFEC D6A90711EC19325ULB |
Tender Fee | 1000 |
EMD | 14670 |
Tender Value | |
Place | Municipal Council Sohna |
Link | https://etenders.hry.nic.in |
Start Date | July 20, 2023 14:30 |
End Date |
29/07/2023 ( Expired 683 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreConstruction of c.c. drain in both sides from south station goswami house and ex. parshad house to main road, vivekanand ward no. 37
Construction of c.c. drain in both sides from south station goswami house and ex. parshad house to main road, vivekanand ward no. 37
Read moreCa no. cwe/hills/rkt/06 of 2025-2026 special repair of, road to upper kaligadhera pump house, road from helipad to main majkhali, internal road at the kumaon regimental centre, pcc road from mt area to gandhi line between building no p-50 to p-52, in
Ca no. cwe/hills/rkt/06 of 2025-2026 special repair of, road to upper kaligadhera pump house, road from helipad to main majkhali, internal road at the kumaon regimental centre, pcc road from mt area to gandhi line between building no p-50 to p-52, in
Read moreConstruction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Read moreStrengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Read moreWard no. 27 construction of c.c. road from kherati masjid
Ward no. 27 construction of c.c. road from kherati masjid to hari masjid lane
Read moreConstruction work of rcc drain in different place at bhairunda
Const. of rcc drain from rashid bashid to shahadat master house, from shriram to mr. gambhir house, and from rashid bashid to suraj house, and from mr. hiralal to mr. amarsingh house, and from. chotu ustad to saddam drain in ward no 04 bhailal colony
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreof your Industry type