Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Boiler Tubes And Bends
|
| Description |
Supply Of Boiler Tubes And Bends
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_JPL_175118_1 |
|
Reference Number |
JPL/CnM/23-24/1100011844 |
| Tender Fee | 0 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | JPL,Seoni |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | November 21, 2023 23:30 |
| End Date |
Expired
12/12/2023
Expired 1035 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027
Read moreSupply of various style crh bends for unit ii boiler
Supply of various style crh bends for unit ii boiler
Read moreSupply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Read moreTtps mech ii bm unit iii renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2026 2027
Ttps mech ii bm unit iii renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2026 2027
Read moreProcurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Procurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Read moreof your Industry type