Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of New A Site Ro For Site Between Km Stone 35 And Km Stone 40 On Nh 25
|
| Description |
Construction Of New A Site Ro With Facilities Like Sales Building Paver Block Driveway And Other Allied Civil An Electrical Works For Site Between Km Stone 35 And Km Stone 40 On Nh 25 Barmer Jodhpur Road Srmp 433 Under Jodhpur Do Of Rso
|
| Organisation | IndianOil | Central Govt. Ministry/Department |
| Tender Id | 2025_NRO_183415_1 |
|
Reference Number |
RCC/NR/RSO/ENG/LT-349/24-25 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | JODHPUR DO |
| Link |
View Original Tender Notice
https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=193693 |
| Start Date | January 29, 2025 21:30 |
| End Date |
Expired
05/02/2025
Expired 507 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreConstruction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreConstruction of vishramgreh area at nro at raipur - vizag expy 74 km rhs on raipur - visakhapatnam expressway, site 1 - 74 km on rhs from origin abhan
Construction of vishramgreh area at nro at raipur - vizag expy 74 km rhs on raipur - visakhapatnam expressway, site 1 - 74 km on rhs from origin abhanpur (wsa site), district-dhamtari, raipur territory.
Read moreConstruction of vishramgreh area at nro at raipur - vizag expy 74 km lhs on raipur - visakhapatnam expressway, site 1 - 74 km on lhs from origin abha
Construction of vishramgreh area at nro at raipur - vizag expy 74 km lhs on raipur - visakhapatnam expressway, site 1 - 74 km on lhs from origin abhanpur (wsa site), district-dhamtari, raipur territory
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreSupply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Supply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreEmergent maintenance work of the existing road of the project construction of 4 lane bridge over irang river on imphal jiribam road section 95.5 km nh 37 at the risk and cost of the epc contractor on percentage rate and work order basis 2nd call
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreof your Industry type