Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Under Ground Pipeline System Of Hadua Irrigation Project, Narasinghpur In District Of Cuttack, Odisha Including Its Distribution Network For Cca Of 3641 Ha On Epc Mode And O And M For 5 Years.
|
Description |
Construction Of Under Ground Pipeline System Of Hadua Irrigation Project, Narasinghpur In District Of Cuttack, Odisha Including Its Distribution Network For Cca Of 3641 Ha On Epc Mode And O And M For 5 Years.
|
Organisation | CCE Brutang and Hadua Irrigation Project Dasapalla | State Govt. and UT |
Tender Id | 2024_CCEBH_107084_1 |
Reference Number |
BHIP-HID-UGPL-01 of 2024-25 |
Tender Fee | 10000 |
EMD | 1.68 Crore |
Tender Value | |
Place | Narasinghpur, Cuttack |
Link | https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=516358 |
Start Date | November 18, 2024 19:30 |
End Date |
13/12/2024 ( Expired 191 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).
Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).
Read moreEstablishment of 3 mld desalination plant based on sea water reverse osmosis at v.o.chidambaranar port and operation and maintenance for 5 years on dbo mode
Establishment of 3 mld desalination plant based on sea water reverse osmosis at v.o.chidambaranar port and operation and maintenance for 5 years on dbo mode
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreO and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
O and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
Read moreConstruction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Read moreDesign engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps
Design engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreEng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Read moreof your Industry type