Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Invitation For Estimate Submission: Revetment Construction 🌫️ The Department Of Water Resources, State Govt. And Ut, Invites Estimates From Experienced Contractors For The Construction Of A Revetment Of Approximately 209 Meters Along The Right Side Of River Ravi At Amritsar, For The Safety Of Rmb, C Land, And Bop Shahpur. 🛠️ 📅 Submission Deadline: May 24, 2024, 12:00 Pm 💸 Tender Fee: Inr 7900 Emd: Inr 332659 Interested Contractors Must Submit Detailed Estimates, Including All Costs And Methodologies, Adhering To The Project Specifications And Timelines. Keywords: Revetment Construction, River Ravi, Department Of Water Resources, State Govt. And Ut, Estimate Submission, Contractors, Amritsar| Particulars | Details |
|---|---|
| Title |
Estimate For Providing 209 Meter Revetment U/S Bop Shahpur Forward For The Safety Of Rmb,C Land And Bop Shahpur On Right Side Of River Ravi (100.58 Meter Revetment)
|
| Description |
Estimate For Providing 209 Meter Revetment U/S Bop Shahpur Forward For The Safety Of Rmb,C Land And Bop Shahpur On Right Side Of River Ravi (100.58 Meter Revetment)
|
| Organisation | Department of Water Resources | State Govt. and UT |
| Tender Id | 2023_WR_112802_2 |
|
Reference Number |
- |
| Tender Fee | 7900 |
| EMD | 3.33 Lakh |
| Tender Value | - |
| Place | Amritsar |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=231907 |
| Start Date | November 30, 2023 22:30 |
| End Date |
Expired
24/05/2024
Expired 873 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Estimate for providing 290 meter revetment u/s bop shahpur froward for the safety of rmb,c-land and bop shahpur on right side or river ravi(100.58 meter reventment
Estimate for providing 290 meter revetment u/s bop shahpur froward for the safety of rmb,c-land and bop shahpur on right side or river ravi(100.58 meter reventment
Read more02/6a/nit dt.31-01-2025, estimate for providing 290 meter revetment u/s b op shahpur forward for the safety of rmb,c-land and bop shahpur on right side of river ravi (41.148) meter revetment.
Estimate for providing 290 meter revetment u/s b op shahpur forward for the safety of rmb,c-land and bop shahpur on right side of river ravi (41.148) meter revetment.
Read moreEstimate for providing revetment and studs near bop kit razada opposite advance bundh for the safety of rmb bundh, fencing wire, bunkers, flood lights and c-land of bop kot razada on the right side of river ravi
Estimate for providing revetment and studs near bop kit razada opposite advance bundh for the safety of rmb bundh, fencing wire, bunkers, flood lights and c-land of bop kot razada on the right side of river ravi
Read moreSbd no. 07/6-a/nit dt. 02-06-25 bop shahpur forward
Estimate for providing 290 meter revetment u/s bop shahpur forward for the safety r.m.b, c-land and bop shahpur on right side of river ravi. (41.14) meter revetment
Read more1/6anit 31.01.2025, providing 2 nos studs near bop channa for safety of fencing wire, flood lights and bop channa right side of river ravi
Providing 2 nos studs near bop channa for safety of fencing wire, flood lights and bop channa right side of river ravi
Read moreProviding protection to eroding left edge or river ravi by series of t-studs to save bop chandigarh downstream existing revetment downstream of spur 9230 of sharan bundh on left side of river ravi
Providing protection to eroding left edge or river ravi by series of t-studs to save bop chandigarh downstream existing revetment downstream of spur 9230 of sharan bundh on left side of river ravi
Read moreEstimate for providing t-studs opposite bop panjgrain to check the loop formation and erosion of right side of river ravi caused by flood 2023 to save the bop channa
Estimate for providing t-studs opposite bop panjgrain to check the loop formation and erosion of right side of river ravi caused by flood 2023 to save the bop channa
Read moreProviding revetment for to save bsf wire fencing c land near international border, different bops near bamial bop at right t side on river ujh
Providing revetment for to save bsf wire fencing c land near international border, different bops near bamial bop at right side on river ujh
Read moreRestoring apron spur rd 15500 damaged during flood season 2023 on earthen bundh to save bop shahpur, village abas and c-land on left side of river ravi.
Restoring apron spur rd 15500 damaged during flood season 2023 on earthen bundh to save bop shahpur, village abas and c-land on left side of river ravi.
Read more03/6 anit dt. 27/02/2025 protecting / strengthening of right edge of river ravi at bop tota complex by providing revetment / t-studs near of indo-pak fencing line to save international border fencing line, flood lights and village abas and other d
Protecting / strengthening of right edge of river ravi at bop tota complex by providing revetment / t-studs near of indo-pak fencing line to save international border fencing line, flood lights and village abas and other defence installations for
Read moreof your Industry type