Tender Details
Particulars | Details |
---|---|
Title |
Transformer Oil/Power Oil, Make Apar Only, As Per Is: 335
|
Description |
|
Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
Tender Id | GEM/2025/R/468494 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | March 20, 2025 22:30 |
End Date |
21/03/2025 ( Expired 32 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Disposal of hazardous waste such as used lube oil, metallic barrels filled with drained liquid sludge (mixture of waste oil, water and mostly water condensate) and empty metallic barrels under mmw of assam gas based power station, neepco ltd.
Disposal of hazardous waste such as used lube oil, metallic barrels filled with drained liquid sludge (mixture of waste oil, water and mostly water condensate) and empty metallic barrels under mmw of agbps, neepco ltd., bokuloni chariali, dibrugarh.
Read moreRepair and overhauling service - power plant; as per scope of work; no; service provider premises
Read more
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period
Read moreAtta superfine white brand amar mill,rice brand darbar mogra as per vidyalaya sample,refined oil su
Read more
Dismantling of existing 19 nos. of 132 kv 3 phase double break type isolators and retrofitting of abb make 19 nos. of 3 phase center break type isolators as per work schedule at 2x45 mw rabs hps barginagar.
Dismantling of existing 19 nos. of 132 kv 3 phase double break type isolators and retrofitting of abb make 19 nos. of 3 phase center break type isolators as per work schedule at 2x45 mw rabs hps barginagar.
Read moreof your Industry type