Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Side Deckwall For Elecon Make Vibrating Grizzly Feeder Of Model No:25/60 Of Augmentation Of Coal Handling Plant Ktps V And Vi Stages
|
| Description |
Side Deckwall For Elecon Make Vibrating Grizzly Feeder Of Model No:25/60 Of Augmentation Of Coal Handling Plant Ktps V And Vi Stages
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 615262 |
|
Reference Number |
NIT No.128/25-26/CE/OM/KTPS-VVI/Purchase/MM-CHP |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | July 25, 2025 00:30 |
| End Date |
Expired
13/08/2025
Expired 427 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ktps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages
Ktps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages
Read moreLaminated photo identity cards for employees and artisans working under ktps v and vi stages
Laminated photo identity cards for employees and artisans working under ktps v and vi stages
Read moreReplacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Read moreConducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Conducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Read moreSpares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Spares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Read moreDeputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Read moreSpares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Spares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Read moreKtps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Read moreAnnual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type