Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Meter Installation On New Single Phase Connection Jhatpat Niveshmitra In The Area Of Edd Iv Jaunpur
|
| Description |
Work Of Meter Installation On New Single Phase Connection Jhatpat Niveshmitra In The Area Of Edd Iv Jaunpur
|
| Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
| Tender Id | 2024_PVVNV_960570_1 |
|
Reference Number |
29/EDC-I(Jnp)/2024-24 |
| Tender Fee | 1180 |
| EMD | 5000 |
| Tender Value | - |
| Place | SE EDC-1 Jaunpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1670528 |
| Start Date | September 28, 2024 20:30 |
| End Date |
Expired
04/10/2024
Expired 738 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
33kv, 10ka single phase lightning arrestors (line type)
33kv, 10ka single phase lightning arrestors (line type)
Read moreProcurement of single phase energy meters at stpp, jaipur, mancherial, telangana.
Procurement of single phase energy meters at stpp, jaipur, mancherial, telangana.
Read moreDismantling of old chain link fencing and providing compound wall allround kpcl quarters at bhep colony- phase iv
Replacement of damaged chain-link fencing with construction of a compound wall with barbed wire on top along the boundary of bhadra colony for a balance length of 410m.
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreTggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply of 03 nos 245kv, single phase, polymer insulator live tank, oil filled, hermetically sealed, outdoor, self-cooled current transformer at pches, vazinepally.
Tggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply of 03 nos 245kv, single phase, polymer insulator live tank, oil filled, hermetically sealed, outdoor, self-cooled current transformer at pches, vazinepally.
Read moreProviding of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Providing of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Read moreProviding of 3rd alternate source to 33/11kv film nagar indoor ss by laying of 4.9km of 33kv 3x400sq.mm xlpe ug cable (single run) from 33/11kv sandhya ss to 33/11kv film nagar ss (utilizing one cable of triple run cable proposed from 132/33kv manikonda eht ss pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d imp
Providing of 3rd alternate source to 33/11kv film nagar indoor ss by laying of 4.9km of 33kv 3x400sq.mm xlpe ug cable (single run) from 33/11kv sandhya ss to 33/11kv film nagar ss (utilizing one cable of triple run cable proposed from 132/33kv manikonda eht ss pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvements to original works (reserved for st category).
Read moreWork of meter installation on new single phase connection jhatpat niveshmitra in the area of edd i jaunpur
Work of meter installation on new single phase connection jhatpat niveshmitra in the area of edd i jaunpur
Read moreWork of meter installation on new single phase connection of 01 to 04 kw for jhatpat/niveshmitra applied consumers and others under deposit scheme in the area of edd iv (buxa) jaunpur
Work of meter installation on new single phase connection of 01 to 04 kw for jhatpat/niveshmitra applied consumers and others under deposit scheme in the area of edd iv (buxa) jaunpur
Read moreWork of meter installation on new single phase connection of 01 to 04 kw for jhatpat/ niveshmitra applied consumers and others under deposit scheme in the area of edd-iii (jaunpur nagar)
Work of meter installation on new single phase connection of 01 to 04 kw for jhatpat/ niveshmitra applied consumers and others under deposit scheme in the area of edd-iii (jaunpur nagar)
Read moreof your Industry type