Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Overhauling/Refurbishment Of Timken Make Lhb Uic Taper Roller Bearing (Ctrb) By Oem In Carriage Workshop, Nwr, Jodhpur. (24 Months)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77871102 |
|
Reference Number |
2024-30-TIMKENLHB |
| Tender Fee | 0 |
| EMD | 3.83 Lakh |
| Tender Value | - |
| Place | Jaipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77871102/viewNitPdf_4737961.pdf |
| Start Date | October 24, 2024 22:06 |
| End Date |
Expired
14/11/2024
Expired 701 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Up - gradation of infrastructure & augmentation of maintenance facility at railway carriage workshop, jodhpur.
Up - gradation of infrastructure & augmentation of maintenance facility at railway carriage workshop, jodhpur.
Read moreRefurbishment of bernco-nei make uic 130 bearings used in lhb coaches through oem, m/s. national engineering industries ltd. through single tender basis for 02 years at bhavnagar workshop.
Refurbishment of bernco-nei make uic 130 bearings used in lhb coaches through oem, m/s. national engineering industries ltd. through single tender basis for 02 years at bhavnagar workshop.
Read moreRefurbishment of m/s timken india ltd make e-class ctrb s and conversion into upgraded e-class ctrbs of visakhapatnam division for a period of 02 years.
Refurbishment of m/s timken india ltd make e-class ctrb s and conversion into upgraded e-class ctrbs of visakhapatnam division for a period of 02 years.
Read moreVarious types of modification work for rebc of lhb/eog coaches for 24 month at carriage workshop ajmer.
Various types of modification work for rebc of lhb/eog coaches for 24 month at carriage workshop ajmer.
Read moreWork of supply and replacement of openable emergency window in lhb coaches as per cai/rcf/mech/lhb/089 dt. 20.01.2024 at carriage and wagon workshop, northern railway, jagadhri workshop for 18 months.
Work of supply and replacement of openable emergency window in lhb coaches as per cai/rcf/mech/lhb/089 dt. 20.01.2024 at carriage and wagon workshop, northern railway, jagadhri workshop for 18 months.
Read moreScope of work for epoxy flooring (mdts 44289 rev 00 dt 07-07-2016 with amendment slip 1 23.03.2022 (latest) work in toilets of lhb / icf (ac /non-ac) type coaches at nwr railway workshop jodhpur. (48 months)
Scope of work for epoxy flooring (mdts 44289 rev 00 dt 07-07-2016 with amendment slip 1 23.03.2022 (latest) work in toilets of lhb / icf (ac /non-ac) type coaches at nwr railway workshop jodhpur. (48 months)
Read moreRefurbishment of ct roller bearings for vande bharath coaches - timken make - on single tender basis with oem for a period of 01 year at carriage repair shop, tirupati, s.co. railway
Refurbishment of ct roller bearings for vande bharath coaches - timken make - on single tender basis with oem for a period of 01 year at carriage repair shop, tirupati, s.co. railway
Read moreComprehensive amc of airless centrifugal shot blasting plant (swing table type) table dia- 2440 mm (96 inch) m&p no. 137/30 at carriage workshop, nwr, ajmer (as per scope of work)
Comprehensive amc of airless centrifugal shot blasting plant (swing table type) table dia- 2440 mm (96 inch) m&p no. 137/30 at carriage workshop, nwr, ajmer (as per scope of work)
Read moreProvision of epdm modular cable sealing system for disconnecting and earthing device and ht compartment of sbc panel in lhb coaches, power car & pantry car at carriage repair workshop/mancheswar for 18 months.
Provision of epdm modular cable sealing system for disconnecting and earthing device and ht compartment of sbc panel in lhb coaches, power car & pantry car at carriage repair workshop/mancheswar for 18 months.
Read moreDismantling and cleaning of wheel set axle assembly box & dismounting of ctrb & cleaning, painting, transportation and assistance in testing of lhb dampers and shock absorber & assistance in zyglo testing of roller bearing as per scope of work at bhavnagar workshop for 1 year.
Dismantling and cleaning of wheel set axle assembly box & dismounting of ctrb & cleaning, painting, transportation and assistance in testing of lhb dampers and shock absorber & assistance in zyglo testing of roller bearing as per scope of work at bhavnagar workshop for 1 year.
Read moreof your Industry type