Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 2 Lane Rob In Lieu Of Level Crossing 12 C Near Kadipur Railway Station Babatpur Chaubeypur
|
Description |
Re Wall With Road Work
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPSBC_860694_1 |
Reference Number |
2971/E-Tender/ROB-12C/2023-24 Dt. 04-11-22023 |
Tender Fee | 11800 |
EMD | 14.94 Lakh |
Tender Value | |
Place | Varanasi |
Link | https://etender.up.nic.in |
Start Date | November 09, 2023 15:30 |
End Date |
28/11/2023 ( Expired 577 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Read moreDevelopment, operation and maintenance of ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.
Development, operation and maintenance of ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreRfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Read moreWidening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Read moreConstruction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreConstruction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreof your Industry type