Tender Details
Particulars | Details |
---|---|
Title |
Formation Of New Permanent Nursery The Rate Includes The Cost Of Leveling Tractorization Complete Soil Working Cutting Upto A Depth Of 1.5 To 2, Formation Of Nursery Beds ,Raising Of Bunds , Water Channels And Paths
|
Description |
Formation Of New Permanent Nursery The Rate Includes The Cost Of Leveling Tractorization Complete Soil Working Cutting Upto A Depth Of 1.5 To 2, Formation Of Nursery Beds ,Raising Of Bunds , Water Channels And Paths
|
Organisation | FOREST DEPARTMENT | State Govt. and UT |
Tender Id | 2024_FD_252877_2 |
Reference Number |
e- NIT NO 03 OF 2024-25 DATED 12-07-2024 |
Tender Fee | 500 |
EMD | 15114 |
Tender Value | |
Place | Formation of new permanent nursery the rate includ |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=734962 |
Start Date | July 12, 2024 14:30 |
End Date |
19/07/2024 ( Expired 295 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying c.c. in the common passage in front of type-4 houses and p/f paver blocks in the type-2 new houses, pgi residential campus, sector-12, chandigarh. sh (horticulture work)
Providing and laying c.c. in the common passage in front of type-4 houses and p/f paver blocks in the type-2 new houses, pgi residential campus, sector-12, chandigarh. sh(horticulture work)
Read moreAzadpur i.e. raising g.t. of storm water drain ic filling of depressions area of a b road dismantling and re construction of boundary wall improvement of footpath along boundary wall towards railway land
Comprehensive maintenance of entire nsm area azadpur i.e. raising g.t. of storm water drain ic filling of depressions area of a b road dismantling and re-construction of boundary wall improvement of footpath along boundary wall towards railway land
Read moreDeveloping of biosafety lab-bsl-2 lab including renovation and up gradation
Developing of biosafety lab bsl-2 lab including renovation and up-gradation in the school of life sciences, jawaharlal nehru university, new delhi-110067
Read moreFormation of new permanent nursery the rate includes the cost of leveling tractorization complete soil working cutting upto a depth of 1.5 to 2, formation of nursery beds ,raising of bunds , water channels and paths
Formation of new permanent nursery the rate includes the cost of leveling tractorization complete soil working cutting upto a depth of 1.5 to 2, formation of nursery beds ,raising of bunds , water channels and paths
Read moreConstruction of one semi permanent structure for septic labour room at 1st floor front western open space of unakoti district hospital at bhagabannagar, kailashahar, unakoti tripura including sanitary installation and water supply line etc complete.
Construction of one semi permanent structure for septic labour room at 1st floor front western open space of unakoti district hospital at bhagabannagar, kailashahar, unakoti tripura including sanitary installation and water supply line etc complete.
Read moreBoring and installing of 2 nos. tubewells (1 no. in village dappar w.no.2 and 1 no. near verka store lalru) with reverse rotary rig size 250mm x 250mm upto 350 mtr. depth all other works contingent thereto at lalru distt s.a.s nagar
Boring and installing of 2 nos. tubewells (1 no. in village dappar w.no.2 and 1 no. near verka store lalru) with reverse rotary rig size 250mm x 250mm upto 350 mtr. depth all other works contingent thereto at lalru distt s.a.s nagar
Read moreTtps es circle em i rectification of defective stator water expansion tank level regulator by fabrication of new level regulator bushing phosphors bronze material including cutting drilling machining and blue matching work and assembling and allied w
Ttps es circle em i rectification of defective stator water expansion tank level regulator by fabrication of new level regulator bushing phosphors bronze material including cutting drilling machining and blue matching work and assembling and allied w
Read moreConstruction of 06 new 33 kv ais air insulted substations i.e. 1 behrampur 2 pawti and 3 narukheri 4 munna rehri 5 alipur viran 6 kalsora with associated 33 kv and 11 kv link lines including complete civil works on turnkey basis
Construction of 06 new 33 kv ais air insulted substations i.e. 1 behrampur 2 pawti and 3 narukheri 4 munna rehri 5 alipur viran 6 kalsora with associated 33 kv and 11 kv link lines including complete civil works on turnkey basis
Read moreFormation of internal roads including construction of rcc side drain and box culvert, providing streetlight and water supply distribution system (mathur village) at sipcot industrial park, cheyyar-phase-ii
Formation of internal roads including construction of rcc side drain and box culvert, providing streetlight and water supply distribution system (mathur village) at sipcot industrial park, cheyyar-phase-ii
Read moreInvestigation and survey (on gis basis) of the project area including soil investigation, engineering design (hydraulic and structural) as required, procurement of all labour n material, tnp etc. and construction of 15 mld ttp for reuse treated water
Investigation and survey (on gis basis) of the project area including soil investigation, engineering design (hydraulic and structural) as required, procurement of all labour n material, tnp etc. and construction of 15 mld ttp for reuse treated water
Read moreof your Industry type