Tender Details
Particulars | Details |
---|---|
Title |
Defective Replacement Of Cooling Water And Fire Fighting Pipe Lines Etc At Kadamparai Power House
|
Description |
Defective Replacement Of Cooling Water And Fire Fighting Pipe Lines Etc At Kadamparai Power House
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 12400 |
Tender Value | |
Place | Kadamparai Power House |
Link |
AAAAAAAAAA Login to view |
Start Date | May 09, 2025 23:30 |
End Date |
26/05/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreAnnual overhauling of 10.2 mw capacity hydro machine no. 02 installed at 3x10.2 mw capacity matatila power house lalitpur
Annual overhauling of 10.2 mw capacity hydro machine no. 02 installed at 3x10.2 mw capacity matatila power house lalitpur
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreConstruction of fast track buildings at iit bombay
Construction of fast track buildings including design ,drawing, finishing works, water supply and sanitary installations, internal and external electrical installation , lan, wifi,cctv, fire-fighting system, automatic fire alarm etc. at iit bombay
Read moreManufacturing and supply of high pressure cold drawn seamless steel tubes for use in high pressure boilers at various thermal power stations of m.p. power generating co. ltd.
Manufacturing and supply of high pressure cold drawn seamless steel tubes for use in high pressure boilers at various thermal power stations of m.p. power generating co. ltd.
Read moreMaintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Maintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Read moreProvn of fire detection system and allied works at lsw hanger at 9brd
Provn of fire detection system and allied works at lsw hanger at 9brd
Read moreof your Industry type