Urgent Repair, Maintenance At Risk And Cost Of Contractor For Rimuli Koida Section Of Nh 520 I.E. Pkg 1 Under Nhdp Iii In The State Of Odisha
|
Description |
Urgent Repair, Maintenance At Risk And Cost Of Contractor For Rimuli Koida Section Of Nh 520 I.E. Pkg 1 Under Nhdp Iii In The State Of Odisha
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 25000 |
EMD | 9.79 Lakh |
Tender Value | |
Place | Panikoili Rimuli |
Link |
AAAAAAAAAA Login to view |
Start Date | May 24, 2025 18:30 |
End Date |
23/06/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreEngaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreConsultancy services for supervision consultant (sc) for operation and maintenance of four lane divided highway from madurai - chettikulam - natham section from km 0.000 to km 36.690 of nh-785 in the state of tamil nadu (2nd call)
Consultancy services for supervision consultant (sc) for operation and maintenance of four lane divided highway from madurai - chettikulam - natham section from km 0.000 to km 36.690 of nh-785 in the state of tamil nadu (2nd call)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreIndependent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Read moreof your Industry type