Tender Details

Particulars Details
Title
1091/Supply Of Super Heater Boiler Tubes
Description
Supply Of Super Heater Boiler Tubes
Organisation Kisan Sahkari Chini Mills Ltd. Sneh Road Nazibabad-Bijnor | State Govt. and UT
Tender Id 2025_KSCS_1071561_1
Reference
Number
1091/SUPPLY OF SUPER HEATER BOILER TUBES
Tender Fee 590
EMD 20000
Tender Value -
Place KISAN SAHKARI CHINI MILLS LTD NAJIBABAD
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1955393

Start Date September 05, 2025 20:30
End Date
Expired 10/09/2025

Expired 398 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Cogen boiler super heater zone insulation work

Cogen boiler super heater zone insulation work

Read more
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler

Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler

Read more
Boiler#5 start up and super heater safety valve work

Boiler#5 start up and super heater safety valve work

Read more
Water wall tubes of cpp boiler (bqsl tubes)

Water wall tubes of cpp boiler (bqsl tubes)

Read more
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler

Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler

Read more

State plan 2026-27 rwss to valiyakulam supply erection and testing of new 5hp submersible pumpset at kuzhinjanvila pump house.

Read more
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification

Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification

Read more
Ot 14 removing and refixing the cassette baffle from low temperature super heater ltsh

Removing and refixing the cassette baffle from low temperature super heater ltsh upper bank coils and low temperature reheater ltrh lower bank coils shrouding plates from various places of boiler tubes such that hra fsh and frh

Read more
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area

Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area

Read more
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2

Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise