Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Deposit Calicut University Establishment Of Network Restructuring Fibre Backbone Phase Ii General Electronics Work
|
| Description |
Deposit Calicut University Establishment&Amp#X0d
Of Network Restructuring Fibre Backbone &Amp#X0d
Phase Ii General Electronics Work
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_682273_1 |
|
Reference Number |
PWD/BLDG/TR/12028/2024_7_1_1/1 |
| Tender Fee | 5515 |
| EMD | 50000 |
| Tender Value | - |
| Place | university of calicut |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1061361 |
| Start Date | July 26, 2024 15:30 |
| End Date |
Expired
16/08/2024
Expired 790 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing lan connection for computer lab of integrated ma in development studies at centre for health science
Providing lan connection for computer lab of integrated ma in development studies at centre for health science
Read moreElectrification for additional outer lights (street light) at administration block in the university campus
Electrification for additional outer lights (street light) at administration block in the university campus
Read moreElectrification for street light at iet campus, kohinoor
Electrification for street light at iet campus, kohinoor
Read moreAdditional electrification in connection with the false ceiling work at seminar hall, smart classroom and research lab of department of computer science under pm usha scheme
Additional electrification in connection with the false ceiling work at seminar hall, smart classroom and research lab of department of computer science under pm usha scheme
Read moreUrgent repair and maintenance of h18b and h41a quarters
Urgent repair and maintenance of h18b and h41a quarters
Read moreComprehensive annual maintenance contract (camc) for the hardware components of hyper converged infrastructure at university of calicut for a period of two years
Comprehensive annual maintenance contract (camc) for the hardware components of hyper converged infrastructure at university of calicut for a period of two years
Read moreSelection of a multidisciplinary consultancy agency for conducting feasibility study, detailed technical investigations and preparation of comprehensive master plan for the proposed perambra regional centre at nochad grama panchayat
Selection of a multidisciplinary consultancy agency for conducting feasibility study, detailed technical investigations and preparation of comprehensive master plan for the proposed perambra regional centre at nochad grama panchayat
Read moreProvision for noc in relation with mpls network backbone in mumbai division, western railway.
Provision for noc in relation with mpls network backbone in mumbai division, western railway.
Read morePackage-c1: dwdm equipment package under augmentation of telecom backbone network and associated infrastructure project.
Package-c1: dwdm equipment package under augmentation of telecom backbone network and associated infrastructure project.
Read moreSplit air conditioner, wall mount type (v3) isi marked to is 1391 (part 2)
Split air conditioner, wall mount type (v3) isi marked to is 1391 (part 2)
Read moreof your Industry type