Tender Details

Particulars Details
Title
Annual Maintenance To Alladurg Metalkunta Road From Km 5/0 To 17/0 For The Year 2024 25 In Sangareddy District (2nd Call)
Description
Annual Maintenance To Alladurg Metalkunta Road From Km 5/0 To 17/0 For The Year 2024 25 In Sangareddy District (2nd Call)
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 539148
Reference
Number
NITNo.EE(RB)/SRD/PAtoEE/DB/T1/05/09/2024-2025, dt:23/08/2024
Tender Fee 93
EMD 2700
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date August 29, 2024 16:30
End Date

05/09/2024 ( Expired 255 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)

Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)

Read more
Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).

Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Cs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)

Cs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)

Read more
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh

Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more

Rahimpur rajbalhat tarar more road from 0.000 km to 8.360 km, excluding 3.7 km to 4.0 km, strengthening work under hooghly highway division no.- i, in the district of hooghly

Read more
Gopiballavpur nayagram road from 35.00 km to 41.60km

Gopiballavpur nayagram road from 35.00 km to 41.60km, strengthening work including reconstruction of 2 nos. cd structures and 215.00 m protective work under jhargram highway division in the district of jhargram.

Read more
Construction of cc road from pahalanpur bazar to kamarpara via mudipara and singhpara within raina-ii block in the district of purba bardhaman (length 1.830 km)

Construction of cc road from pahalanpur bazar to kamarpara via mudipara and singhpara within raina-ii block in the district of purba bardhaman (length 1.830 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise