Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Permanent Bath Cum Toilet Block At Bop Pancheshwar Of 5 Bn Ssb Champawat
|
Description |
Construction Of Permanent Bath Cum Toilet Block At Bop Pancheshwar Of 5 Bn Ssb Champawat
|
Organisation | DG Sashastra Seema Bal,MHA | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 40217 |
Tender Value | |
Place | Pancheshwar |
Link |
AAAAAAAAAA Login to view |
Start Date | April 09, 2025 16:30 |
End Date |
21/04/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of ration store and telephone exchange including guard room, toilet and bathroom at mrc wellington
Construction of ration store and telephone
 exchange including guard room, toilet and bathroom
 at mrc wellington
Read moreTender for canal water based water supply project for construction of 4.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 0.50 lakh gallon ohsr part-2 at khanauri town
Tender for canal water based water supply project for construction of 4.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 0.50 lakh gallon ohsr part-2 at khanauri town
Read moreUpgradation and 5 years routine maintenance of mrl-30 - kallikudi - thiruchuli road to srirampoor - thamaraikulam road (via) kilavaneri road in package no. tn28-134 at kariapatti block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Upgradation and 5 years routine maintenance of mrl-30 - kallikudi - thiruchuli road to srirampoor - thamaraikulam road (via) kilavaneri road in package no. tn28-134 at kariapatti block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Read moreUpgradation and 5 years routine maintenance of mrl-32 aruppukottai - valinokkam road to maravarperungudi (via) thummuchinnampatti road in package no. tn28-135 at thiruchuli block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Upgradation and 5 years routine maintenance of mrl-32 aruppukottai - valinokkam road to maravarperungudi (via) thummuchinnampatti road in package no. tn28-135 at thiruchuli block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Read moreUpgradation and 5 years routine maintenance of mrl-31 - sattur - thayilpatti road to - v.duraisamypuram - road road in package no. tn28-136 at vembakottai block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Upgradation and 5 years routine maintenance of mrl-31 - sattur - thayilpatti road to - v.duraisamypuram - road road in package no. tn28-136 at vembakottai block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreConstruction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Construction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreAAAAAAAAAA
Login to viewConstruction of steel bridge of (3 x 30mtr) span with 2(two) nos. sentry post at both end and drop gates over tributary of nagar river (gin-192) near bp. no. 358/2-r under aor of bop kakarmani of 72 bn bsf along the alignment of indo bangladesh border road in uttar dinajpur district of west bengal.
Read moreAll in one bid for construction of 1 nos water detention structure at dakshin amraberia wds, mouza- dakshin amraberia , block- kulpi ,gp- chandipur , jl no 89 , plot no 2501 in the district of south 24 parganas under wbadmip -phase ii
All in one bid for construction of 1 nos water detention structure at dakshin amraberia wds, mouza- dakshin amraberia , block- kulpi ,gp- chandipur , jl no 89 , plot no 2501 in the district of south 24 parganas under wbadmip -phase ii
Read moreof your Industry type