Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏗️ Invitation For Bids: Construction Of Piezometers 🌱 The Central Ground Water Board, Under The Ministry Of Jal Shakti, Invites Bids From Experienced Contractors For The Construction Of 24 Piezometers In Various Geological Formations Across The States Of Assam, Meghalaya, And Arunachal Pradesh. 📅 Bid Submission Deadline: July 25, 2024, 3:00 Pm Tender Fee: Inr 5000 Emd: Inr 319020 Interested Bidders Must Demonstrate Their Capability To Undertake Such Projects In Diverse Geological Settings. Detailed Proposals, Including Technical Specifications, Methodology, And Financial Bids, Are To Be Submitted By The Stipulated Deadline. Keywords: Construction, Piezometers, Geological Formations, Central Ground Water Board, Jal Shakti Ministry, Bid Submission, Tender Fee, EmdParticulars | Details |
---|---|
Title |
Construction Of Piezometers 24 Nos In Soft Rock/Hard Rock/ Bouldery Formation In The State Of Assam, Meghalaya And Arunachal Pradesh
|
Description |
Construction Of Piezometers 24 Nos In Soft Rock/Hard Rock/ Bouldery Formation In The State Of Assam, Meghalaya And Arunachal Pradesh
|
Organisation | Central Ground Water Board | Central Govt. Ministry/Department |
Tender Id | 2024_CGWB_789970_1 |
Reference Number |
NIET No. 24/2022-23/MMS-I |
Tender Fee | 5000 |
EMD | 3.19 Lakh |
Tender Value | |
Place | Faridabad |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=856461 |
Start Date | July 04, 2024 23:30 |
End Date |
13/08/2024 ( Expired 327 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read moreRenovation and modernisation of existing 33 11kv ss in entire state of assam
Renovation and modernization (r a m) of existing 33/11 kv sub-stations with replacement of defective/dilapidated switchgears, auto reclosures and other equipments, with civil works including construction of control room building etc. in assam
Read moreConstruction and development of ksheer sagar udhyan in ward 24
Construction and development of ksheer sagar udhyan &#x0d in ward 24
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india
World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiii)
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply works (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, ai based cwims and cmms and 7 years of om for entire water supply (except intake to wtp) on dbo basis in amaravati
Survey, investigation, design, construction of balance works, testing, commissioning of water supply works (clear water pump house (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, a.i based centralized water information management system (cwims) computerized maintenance management system (cmms) and 7 years om for entire water supply (except intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiv)
Read moreConstruction of hl bridge (3 span 11.00 m each eff) on khalchian drain in village kang on khadoor sahib tarn taran road at rd 9300 mtr including approaches and di package on pb-22-015-a under pmgsy iii batch ii for the year 2023-24 scheme
Construction of hl bridge (3 span 11.00 m each eff) on khalchian drain in village kang on khadoor sahib tarn taran road at rd 9300 mtr including approaches and di package on pb-22-015-a under pmgsy iii batch ii for the year 2023-24 scheme
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(4th call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(4th call)
Read moreof your Industry type