Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 5 Cell 3x3.00 Mtr. Spam Box Culvert, Approach Road And Protection Work On Huzoorpur Jagdishpur Road To Yadavpur Matehiya Via Gangtahiya Link Road In Financial Year 2023 24
|
Description |
Construction Of 5 Cell 3x3.00 Mtr. Spam Box Culvert, Approach Road And Protection Work On Huzoorpur Jagdishpur Road To Yadavpur Matehiya Via Gangtahiya Link Road In Financial Year 2023 24.
|
Organisation | Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT |
Tender Id | 2025_CEDPW_1015589_3 |
Reference Number |
923/8 Kam/e_Tendering/2024-25 Dated 22-02-2025 |
Tender Fee | 2715 |
EMD | 5.5 Lakh |
Tender Value | |
Place | Bahraich |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1830196 |
Start Date | March 10, 2025 14:30 |
End Date |
18/03/2025 ( Expired 82 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreSpecial repair of link road from (jal kpt road) to wariana to fateh jalal to (g t road kartarpur) in district jalandhar under sr programme 2022-23 2023-24 and 2024-25 group no 1
Special repair of link road from (jal kpt road) to wariana to fateh jalal to (g t road kartarpur) in district jalandhar under sr programme 2022-23 2023-24 and 2024-25 group no 1
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of extra-dosed psc box bridge across banas river of road connecting deoli to jaipur via bisalpur and todaraisingh district tonk in state of rajasthan
Construction of extra-dosed psc box bridge across banas river of road connecting deoli to jaipur via bisalpur and todaraisingh district tonk in state of rajasthan
Read moreConstruction of rcc covered drain in lieu of brick drain near sports complex of hq mb area and provn of rcc retaining wall and box type culvert at approach road of children school at manekshaw enclave in the area of age b/r-i under ge (west) jabalpur
Construction of rcc covered drain in lieu of brick drain near sports complex of hq mb area and provn of rcc retaining wall and box type culvert at approach road of children school at manekshaw enclave in the area of age b/r-i under ge (west) jabalpur
Read moreof your Industry type