Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Chavadippara Drinking Water Project Second Stage
|
| Description |
Chavadippara Drinking Water Project Second Stage
|
| Organisation | Local Self Government Department | State Govt. and UT |
| Tender Id | 2023_LSGD_636385_23 |
|
Reference Number |
- |
| Tender Fee | 750 |
| EMD | 8474 |
| Tender Value | - |
| Place | Pudussery GP |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=967782 |
| Start Date | December 28, 2023 17:30 |
| End Date |
Expired
08/01/2024
Expired 999 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreSupply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreTholur kunnu drinking water project pipe line installation second stage
Tholur kunnu drinking water project pipe line installation second stage
Read moreTholur kunnu drinking water project pipe line installation second stage
Tholur kunnu drinking water project pipe line installation second stage
Read moreKarode gp 23-24 pro.no. 275/24-ayira drinking water project second stage in ward 6
Karode gp 23-24 pro.no. 275/24-ayira drinking water project second stage in ward 6
Read moreDrinking water project kaimadapara second reach-project no.110 23-24
Drinking water project kaimadapara second reach-project no.110 23-24
Read moreAnnual plan 259/23 24 vijayapuram gp improvements to kosamattom colony drinking water project second stage scp
Annual plan 259/23 24 vijayapuram gp improvements to kosamattom colony drinking water project second stage scp
Read moreof your Industry type