Tender Details

Particulars Details
Title
Preparation Of Detailed Project Report Dpr For Widening Upgradation To 2 Lane Paved Shoulder From Kmp 634.000 To Km 674. Of Nh 31 New Nh 717 Under National Highway Division No Ix, In The District Of Jalpaiguri
Description
Preparation Of Detailed Project Report Dpr For Widening Upgradation To 2 Lane Paved Shoulder From Kmp 634.000 To Km 674. Of Nh 31 New Nh 717 Under National Highway Division No Ix, In The District Of Jalpaiguri
Organisation PW(ROADS)(NH) | State Govt. and UT
Tender Id 2024_NH_757483_1
Reference
Number
NIQ No.01 of 2024-25, EE,NH Div. IX
Tender Fee 0
EMD 20000
Tender Value
Place Kmp 634.000 to Km 674. of NH 31 new NH 717
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1674573
Start Date October 01, 2024 15:30
End Date

18/10/2024 ( Expired 186 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)

Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)

Read more
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)

Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Consultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode

Consultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode

Read more
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Read more
Wbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)

Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise