Tender Details
Particulars | Details |
---|---|
Title |
Execution Of Electrical Installation Work For Providing Power Supply To 11 Kv Line Using 55 Sq. Mm Aaa Conductor And 10 Mtr Psc Pole 0.65 Km., 25 Kva Plinth Mounted, Dt Using 11 Mtr Wpb Pole 1 No For Pws To Goudaranapada Under Brahmagiri Block.
|
Description |
Execution Of Electrical Installation Work For Providing Power Supply To 11 Kv Line Using 55 Sq. Mm Aaa Conductor And 10 Mtr Psc Pole 0.65 Km., 25 Kva Plinth Mounted, Dt Using 11 Mtr Wpb Pole 1 No For Pws To Goudaranapada Under Brahmagiri Block.
|
Organisation | Rural Water Supply and Sanitation | State Govt. and UT |
Tender Id | 2025_RWSS_112316_1 |
Reference Number |
RWSS DIVISION PURI 01 OF 2025-26 |
Tender Fee | 6000 |
EMD | 12000 |
Tender Value | |
Place | GOUDARANAPADA, BRAHMAGIRI, PURI |
Link | https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=535696 |
Start Date | April 08, 2025 18:00 |
End Date |
21/04/2025 ( Expired 21 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 11/.4kv 250kva plinth mounted substation 1 nos using two nos 11 mtr wpb pole for dp structure and shifting and re-erection of 3ph3w 11kv oh line with 55 mm2 conductor using 11 mtr long wpb pole in 11kv k.s. nagar town feeder under k.
Electrical work.
Read moreExecution of electrical installation work for providing power supply to 11kv line using 55 sq. mm-aaa conductor and 10 mtr psc pole-0.65 km., 25 kva plinth mounted, dt using 11mtr wpb pole-1 no for pws to goudaranapada under brahmagiri block.
Execution of electrical installation work for providing power supply to 11kv line using 55 sq. mm-aaa conductor and 10 mtr psc pole-0.65 km., 25 kva plinth mounted, dt using 11mtr wpb pole-1 no for pws to goudaranapada under brahmagiri block.
Read moreExecution of electrical installation work for providing power supply to 11kv line using 55 sq. mm-aaa conductor and 10 mtr psc pole-0.65 km., 25 kva plinth mounted, dt using 11mtr wpb pole-1 no for pws to goudaranapada under brahmagiri block.
Execution of electrical installation work for providing power supply to 11kv line using 55 sq. mm-aaa conductor and 10 mtr psc pole-0.65 km., 25 kva plinth mounted, dt using 11mtr wpb pole-1 no for pws to goudaranapada under brahmagiri block.
Read moreSurvey, supply, transportation, carriage, erection, testing and commissioning for creation 400 kva sub station alongwith erection of 11 kv line on 9 mtr. st poles, 30mm sq acsr weasel conductor, lt line on 8 mtr. st pole at iid centre battal ballian
Creation 400 kva sub station alongwith erection of 11 kv line on 9 mtr. st poles, 30mm sq acsr weasel conductor, lt line on 8 mtr. st pole at iid centre battal ballian udhampur
Read moreSitc of 2x 250kva ,11/0.4kv s/s and 11kv oh line with gi joist pole and 100 sqmm insulated conductor for power supply to proposed intake well on bank of river baitarani, akhuapada, bhadrak
Sitc of 2x 250kva ,11/0.4kv s/s and 11kv oh line with gi joist pole and 100 sqmm insulated conductor for power supply to proposed intake well on bank of river baitarani, akhuapada, bhadrak
Read moreSurvey supply transportation carriage erection testing and commissioning for creationof 63 kva substns alongwith erection of 11 kv line on 9 mtr st poles 30mm sq acsr conductor lt line on 8 mtr st pole at village kakrai wno5 st basti
For creation of 63 kva sub stations alongwith erection of 11 kv line on 9 mtr. st poles, 30mm sq acsr conductor lt line on 8 mtr. st pole at village kakrai w.no 5 st basti tehsil majalta distirct udhampur on turnkey basis under ut capex
Read moreSitc of 2x 250kva ,11/0.4kv s/s and 11kv oh line with gi joist pole and 100 sqmm insulated conductor for power supply to proposed intake well on bank of river baitarani, akhuapada, bhadrak.
Sitc of 2x 250kva ,11/0.4kv s/s and 11kv oh line with gi joist pole and 100 sqmm insulated conductor for power supply to proposed intake well on bank of river baitarani, akhuapada, bhadrak.
Read moreExecution of electrical installation work for providing power supply of con of 11kv line with 9mtr psc pole-0.67 km.25kva 9mtr psc pole mounted dt-1 no,sc-10mtr to the rwss point at village bharatipur for pws to bharatipur under pipili block
Execution of electrical installation work for providing power supply of con of 11kv line with 9mtr psc pole-0.67 km.25kva 9mtr psc pole mounted dt-1 no,sc-10mtr to the rwss point at village bharatipur for pws to bharatipur under pipili block
Read moreSupply, installation, testing and commissioning of 11 0.4kv, 250kva plinth mounded substation, 11kv dp on 11 mtr joist pole, 11kv line dp along with construction of 3 phase 4 wire ab cable for power supply to gcpe, kulundi, sambalpur
Supply, installation, testing and commissioning of 11 0.4kv, 250kva plinth mounted substation, 11kv dp on 11 mtr joist pole, 11kv line dp along with construction of 3 phase 4 wire ab cable for power supply to gcpe, kulundi, sambalpur
Read moreExecution of electrical installation work for providing power supply of con of 11kv line with 9mtr psc pole-0.67 km.,25kva 9mtr psc pole mounted dt-1 no, sc-10mtr to the rwss point at village bharatipur for pws to bharatipur under pipili block
Execution of electrical installation work for providing power supply of con of 11kv line with 9mtr psc pole-0.67 km.,25kva 9mtr psc pole mounted dt-1 no, sc-10mtr to the rwss point at village bharatipur for pws to bharatipur under pipili block
Read moreof your Industry type