Tender Details

Particulars Details
Title
Erection Of Ohe Works For 2 X 25 Kv Traction System Between Katni (Kte) Singrauli (Sgrl) Section Of Jabalpur Division Under West Central Railway (Wcr) In The State Of Mp.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79464223
Reference
Number
KR-CO-EL-KTE-SGRL-T-38-24
Tender Fee 0
EMD 2.63 Lakh
Tender Value -
Place Navi Mumbai
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79464223/viewNitPdf_4829530.pdf

Start Date January 09, 2025 16:57
End Date
Expired 24/01/2025

Expired 635 days ago

Search Similar tenders?

Bidding on tenders like this?

Partners, bid preparation, supplier quotes and GeM registration, from our team and partners.

Similar Tenders
Improvement of safety and operational efficiency by replacement of outlived signal leds and relays of kte-mkp & kte - sgrl section on jabalpur division of west central railway.

Improvement of safety and operational efficiency by replacement of outlived signal leds and relays of kte-mkp & kte - sgrl section on jabalpur division of west central railway.

Read more
Reliability measure for ohe including (a) provision of 160 sq.mm. jumper over jabalpur division (b) provision of 150 sq.mm. copper cross feeder wire in kte-bina section of jabalpur division.

Reliability measure for ohe including (a) provision of 160 sq.mm. jumper over jabalpur division (b) provision of 150 sq.mm. copper cross feeder wire in kte-bina section of jabalpur division.

Read more
Trd/ohe works in connection with track-related works under wp 2025-26 in the bina-katni section of jabalpur division.

Trd/ohe works in connection with track-related works under wp 2025-26 in the bina-katni section of jabalpur division.

Read more
Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro

Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro

Read more
Design, supply , erection, testing and commissioning of 25kv, 50 hz, single phase, ac traction over head equipments (ohe) and modification in the existing ohe for patch doubling between aduturai and sundaraperumal koil section in tiruchirappalli division of southern railway.

Design, supply , erection, testing and commissioning of 25kv, 50 hz, single phase, ac traction over head equipments (ohe) and modification in the existing ohe for patch doubling between aduturai and sundaraperumal koil section in tiruchirappalli division of southern railway.

Read more
Design, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india

Design, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india

Read more
Design, supply, erection, testing & commissioning of railway electrification work of 2x25 kv ac ohe traction system along with boundary sectioning posts (bsps), sub-sectioning posts (ssps) between sahjanwa (excl.) to bansgaon (incl.) section in connection with sahjanwa - dohrighat new bg line project in n.e. railway of lucknow division

Design, supply, erection, testing & commissioning of railway electrification work of 2x25 kv ac ohe traction system along with boundary sectioning posts (bsps), sub-sectioning posts (ssps) between sahjanwa (excl.) to bansgaon (incl.) section in connection with sahjanwa - dohrighat new bg line project in n.e. railway of lucknow division

Read more
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction

Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction

Read more

This tender has closed

Leave your details and we'll alert you to new tenders like it.

Free tender checklists for your industry →