Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Paved Shoulder At Industrial Area Tonk
|
| Description |
Construction Of Paved Shoulder At Industrial Area Tonk
|
| Organisation | RIICO-Sr. DGM(Tech) | State Govt. and UT |
| Tender Id | 2025_RIICO_464511_2 |
|
Reference Number |
RIICO/SWM/2025-2026/NIT NO-06 |
| Tender Fee | 1680 |
| EMD | 40500 |
| Tender Value | |
| Place | industrial area Tonk |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=833059 |
| Start Date | May 05, 2025 20:30 |
| End Date |
Expired
15/05/2025
Expired 407 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreSupply of man with machine web camera (high skilled) at tonk
Supply of man with machine web camera (high skilled) at tonk
Read moreConstruction and maintenance of industrial safety and security etc at bodhjungnagar industrial estate tripura package 18
Construction and maintenance of industrial safety and security etc at bodhjungnagar industrial estate tripura package 18
Read moreWidening and strengthening work of bassi to industrial area toonga road
Widening and strengthening work of bassi to industrial area toonga road
Read moreUnder district sultanpur, construction of interlocking road from the house of shri ramtej prajapati to the paved road in village lohar west, lot no 1
Under district sultanpur, construction of interlocking road from the house of shri ramtej prajapati to the paved road in village lohar west, lot no 1&#x0d
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreCutting, uprooting and removal of trees in sipcot land (balance land) at sipcot industrial park, panapakkam, ranipet district
Cutting, uprooting and removal of trees in sipcot land (balance land) at sipcot industrial park, panapakkam, ranipet district
Read moreConstruction of concrete drain from house of tarapadi bagdi towards manasatola at thakuranipushkarini under karisunda gram panchayet area under cfc.
Construction of concrete drain from house of tarapadi bagdi towards manasatola at thakuranipushkarini under karisunda gram panchayet area under cfc.
Read moreof your Industry type