Tender Details
Particulars | Details |
---|---|
Title |
Offloading The Work For Denting And Repairing Of Damaged Boom Pulley Platforms Boom Staircase And Railings Of 24 96 Pawan Dragline Of Dudhichua Project
|
Description |
Offloading The Work For Denting And Repairing Of Damaged Boom Pulley Platforms Boom Staircase And Railings Of 24 96 Pawan Dragline Of Dudhichua Project
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_334555_1 |
Reference Number |
DCH/GM (Excv)/Tender/Dragline /2025-26/05 |
Tender Fee | 0 |
EMD | 3700 |
Tender Value | |
Place | NCL, DUDHICHUA PROJECT |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346810 |
Start Date | April 26, 2025 15:00 |
End Date |
06/05/2025 ( Expired 23 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of 24 nos. roller rails of 24/96 dragline and repairing of old/worn-out rollers and fabrication of cages pertaining to live ring assembly of 24/96 draglines at ncl jayant project
Repairing of 24 nos. roller rails of 24/96 dragline and repairing of old/worn-out rollers and fabrication of cages pertaining to live ring assembly of 24/96 draglines at ncl jayant project
Read moreMaintenance of completed works narela zone.
Repairing/rewiring work for missing/broken/damaged wires and other accessories in flats allotted housing pocket 2 at sector g2/g6 and pocket 3,4 and 5 at sector g7/g8,narela.
Read moreFor the work of welding and repairing of damaged st pole in the area of sdo-i, ii and iii, meerut under eudd-ee-11 kv north, meerut
For the work of welding and repairing of damaged st pole in the area of sdo-i, ii and iii, meerut under eudd-ee-11 kv north, meerut
Read moreRepairing work of both side sprocket assembly, swing motor mounting plate, denting, painting of side wall and damaged steel tubes of ck 300 shovel sl. no. 737 deployed at topa ocp, kuju area
Repairing work of both side sprocket assembly, swing motor mounting plate, denting, painting of side wall and damaged steel tubes of ck 300 shovel sl. no. 737 deployed at topa ocp, kuju area
Read moreWork contract for repair and replacement of damaged top pipe railing, platforms and ladders of cooling tower stage i and ii at ghtp lehra mohabat
Work contract for repair and replacement of damaged top pipe railing, platforms and ladders of cooling tower stage i and ii at ghtp lehra mohabat
Read moreP/f granite stone for statue of indira gandhi, refixing of interlock paver block curve stone concertina coil fencing and other misc. work at priyadarshini park, bhopal
P/f granite stone for statue of indira gandhi, refixing of interlock paver block curve stone concertina coil fencing and other misc. work at priyadarshini park, bhopal
Read moreOffloading the work for repairing of oval holes of drag and hoist gearboxes in 24 96 jwala dragline of dudhichua project
Offloading the work for repairing of oval holes of drag and hoist gearboxes in 24 96 jwala dragline of dudhichua project
Read moreOffloading work to outside agency for repairing and vulcanization of 80 nos trailing cable joints on as and when required basis during 2 years duration in 24 96 draglines of dudhichua project
Offloading work to outside agency for repairing and vulcanization of 80 nos trailing cable joints on as and when required basis during 2 years duration in 24 96 draglines of dudhichua project
Read moreOffloading the work for repairing of railpath cracks replacement and tightening of barrel bolts and joint studs and replacement of railsegment and live ring assy in 24 96 vindhya dragline of dudhichua project
Offloading the work for repairing of railpath cracks replacement and tightening of barrel bolts and joint studs and replacement of railsegment and live ring assy in 24 96 vindhya dragline of dudhichua project
Read moreOffloading work for repairing of oval mounting holes of base plate and rack segments with alignment of rack segments and fitment of barrel bolts and joint studs in 24 96 pawan dragline of dudhichua project
Offloading work for repairing of oval mounting holes of base plate and rack segments with alignment of rack segments and fitment of barrel bolts and joint studs in 24 96 pawan dragline of dudhichua project
Read moreof your Industry type