Tender Details

Particulars Details
Title
Pre Fabricated Plastomeric Water Proofing Membrane Laying Work Over The Roof Of Turbine Hall Of Unit 1 To 4 At Btps
Description
Pre Fabricated Plastomeric Water Proofing Membrane Laying Work Over The Roof Of Turbine Hall Of Unit 1 To 4 At Btps
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2025_WBPDC_797201_1
Reference
Number
WBPDCL/BTPS/NIT/E2513/24-25
Tender Fee 0
EMD 49000
Tender Value -
Place Bandel Thermal Power Station, Hooghly
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1768806

Start Date January 25, 2025 16:30
End Date
Expired 07/02/2025

Expired 615 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of gathering hall over the roof of majuli orh.

Construction of gathering hall over the roof of majuli orh.

Read more
Construction of sheet roof over the hall near municipal school no. 20 in ward no. 12 within ratnagiri municipal council limits

Construction of sheet roof over the hall near municipal school no. 20 in ward no. 12 within ratnagiri municipal council limits

Read more
Construction of roof over assembly hall and perimeter fencing of the school compound at reon dabling primary school at gitdabling gp under lava development block

Construction of roof over assembly hall and perimeter fencing of the school compound at reon dabling primary school at gitdabling gp under lava development block

Read more
Repair/replacement of damaged water proofing treatment over roof of production buildings no. 1009 of unit-10 and 0608 of unit-06 and 0203, 0209, 0210, 0213, 0214, 0216 of unit-02 of ofbl inside factory area.

Repair/replacement of damaged water proofing treatment over roof of production buildings no. 1009 of unit-10 and 0608 of unit-06 and 0203, 0209, 0210, 0213, 0214, 0216 of unit-02 of ofbl inside factory area.

Read more
Removing dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire

Removing dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire

Read more
Pre-fabricated plastomeric water proofing membrane laying work over the roof of stage-i turbine hall at btps

Pre-fabricated plastomeric water proofing membrane laying work over the roof of stage-i turbine hall at btps

Read more
Pre fabricated plastomeric water proofing membrane lining work over the roof of turbine hall of unit 5 at btps

Pre fabricated plastomeric water proofing membrane lining work over the roof of turbine hall of unit 5 at btps

Read more
Pre-fabricated plastomeric water proofing membrane lining work over the roof of turbine hall of unit 5 at btps

Pre-fabricated plastomeric water proofing membrane lining work over the roof of turbine hall of unit 5 at btps

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise