Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pre Fabricated Plastomeric Water Proofing Membrane Laying Work Over The Roof Of Turbine Hall Of Unit 1 To 4 At Btps
|
| Description |
Pre Fabricated Plastomeric Water Proofing Membrane Laying Work Over The Roof Of Turbine Hall Of Unit 1 To 4 At Btps
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_797201_1 |
|
Reference Number |
WBPDCL/BTPS/NIT/E2513/24-25 |
| Tender Fee | 0 |
| EMD | 49000 |
| Tender Value | - |
| Place | Bandel Thermal Power Station, Hooghly |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1768806 |
| Start Date | January 25, 2025 16:30 |
| End Date |
Expired
07/02/2025
Expired 615 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of gathering hall over the roof of majuli orh.
Construction of gathering hall over the roof of majuli orh.
Read moreRepair maint of roof incl water proofing treatment with app membrane at t-ii md accn bldg no- 107 at klp charduar.
Repair maint of md accn
Read moreConstruction of sheet roof over the hall near municipal school no. 20 in ward no. 12 within ratnagiri municipal council limits
Construction of sheet roof over the hall near municipal school no. 20 in ward no. 12 within ratnagiri municipal council limits
Read moreConstruction of roof over assembly hall and perimeter fencing of the school compound at reon dabling primary school at gitdabling gp under lava development block
Construction of roof over assembly hall and perimeter fencing of the school compound at reon dabling primary school at gitdabling gp under lava development block
Read moreRepair/replacement of damaged water proofing treatment over roof of production buildings no. 1009 of unit-10 and 0608 of unit-06 and 0203, 0209, 0210, 0213, 0214, 0216 of unit-02 of ofbl inside factory area.
Repair/replacement of damaged water proofing treatment over roof of production buildings no. 1009 of unit-10 and 0608 of unit-06 and 0203, 0209, 0210, 0213, 0214, 0216 of unit-02 of ofbl inside factory area.
Read moreRemoving dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Removing dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Read morePre-fabricated plastomeric water proofing membrane laying work over the roof of stage-i turbine hall at btps
Pre-fabricated plastomeric water proofing membrane laying work over the roof of stage-i turbine hall at btps
Read morePre fabricated plastomeric water proofing membrane lining work over the roof of turbine hall of unit 5 at btps
Pre fabricated plastomeric water proofing membrane lining work over the roof of turbine hall of unit 5 at btps
Read morePre-fabricated plastomeric water proofing membrane lining work over the roof of turbine hall of unit 5 at btps
Pre-fabricated plastomeric water proofing membrane lining work over the roof of turbine hall of unit 5 at btps
Read moreof your Industry type