Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
C/O Tiles Path From H/O Abdullah Wani To Abdullah Dar Others At Ward No 3 At Watred, Improvement Of Stair Steps / Lanes From Main Road To Wani Mohalla At Ward 2 At Watred
|
| Description |
C/O Tiles Path From H/O Abdullah Wani To Abdullah Dar Others At Ward No 3 At Watred, Improvement Of Stair Steps / Lanes From Main Road To Wani Mohalla At Ward 2 At Watred
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_234914_10 |
|
Reference Number |
NIT_183 REW BUDGAM OF 2023-24 |
| Tender Fee | 300 |
| EMD | 8000 |
| Tender Value | |
| Place | Executive Engineer REW Budgam |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | October 27, 2023 21:30 |
| End Date |
Expired
02/11/2023
Expired 973 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Const. of c. c road and drain from h/o ranvir shakya to h/o devendra pal in village devinagar (g.p. devinagar) mainpuri.
Const. of c. c road and drain from h/o ranvir shakya to h/o devendra pal in village devinagar (g.p. devinagar) mainpuri.
Read moreConstruction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreImprovement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Improvement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Read moreC/o tiles path from h/o abdullah wani to abdullah dar others at ward no 3 at watred, improvement of stair steps / lanes from main road to wani mohalla at ward 2 at watred
C/o tiles path from h/o abdullah wani to abdullah dar others at ward no 3 at watred, improvement of stair steps / lanes from main road to wani mohalla at ward 2 at watred
Read moreC/o tile path with steps from main road to wani mohalla (zalangam)
C/o tile path with steps from main road to wani mohalla (zalangam)
Read moreC/o tile path from main road to h/o aijaz ahmad dar dar mohalla laharwalpora
C/o tile path from main road to h/o aijaz ahmad dar dar mohalla laharwalpora
Read moreConstruction of lane/stair steps from main road to h/o mohd ashraf wani
Construction of lane/stair steps from main road to h/o mohd ashraf wani
Read moreConstruction of lane/stair steps from main road to h/o mohd ashraf wani
Construction of lane/stair steps from main road to h/o mohd ashraf wani
Read moreConstruction of lane/stair steps from main road to h/o mohd ashraf wani
Construction of lane/stair steps from main road to h/o mohd ashraf wani
Read moreof your Industry type