Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nhidcl/Assam/Nh 08 /Sil Ch/Pkg Vi
|
| Description |
4 Lane Of Nh 8 From Design Ch. 87.700 Near Chandkhira Village To Design Ch. 106.730 Near Churaibari Village (Assam Tripura Border) On Silchar Churaibari Pkg 6 In The State Of Assam On Hybrid Annuity Mode
|
| Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
| Tender Id | 2023_NHIDC_786791_1 |
|
Reference Number |
|
| Tender Fee | 59000 |
| EMD | 4.62 Crore |
| Tender Value | |
| Place | Assam |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=827023 |
| Start Date | January 18, 2024 16:30 |
| End Date |
Expired
31/01/2024
Expired 887 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreNhidcl/assam/ nh-8/ham/ie/s-c/pkg-vi/ 2024
Independent engineer services for supervision of construction of 4 lane with paved shoulder of chandkhira village churaibari section of nh-8 in the state of assam on hybrid annuity mode. package- vi
Read moreNhidcl/assam/nh-8/ham/ie /s-c/pkg-v/2024
Independent engineer services for supervision of construction of 4-lane of nh-8 on silchar-churaibari pkg-5 in the state of assam on hybrid annuity mode
Read moreNhidcl/assam /2023-2024/s-c-5/
4-lane of nh-8 form design ch. 62.800 ( of proposed nilambazar/cheragi bypass) to design ch. 87.700 near chandkhira village on silchar-churaibari pkg-5 in the state of assam on hybrid annuity mode
Read moreConstruction of 4 lane greenfield section of nh-33 from mokama (design ch. 0.000) to munger (design ch. 82.400) in the state of bihar on hybrid annuity mode
Construction of 4 lane greenfield section of nh-33 from mokama (design ch. 0.000) to munger (design ch. 82.400) in the state of bihar on hybrid annuity mode
Read moreNhidcl/assam/nh-37 8/ham/ie/s-c/pkg-iv/2024
Independent engineer services for four laning of badarpur -churaibari section of nh-37 nh-8 in the state of assam (package-iv) on hybrid annuity mode.
Read moreIndependent engineer services for construction of 4 lane greenfield section of nh- 33 from mokama (design ch. 0.000) to munger (design ch. 82.400) in the state of bihar on hybrid annuity mode.
Independent engineer services for construction of 4 lane greenfield section of nh- 33 from mokama (design ch. 0.000) to munger (design ch. 82.400) in the state of bihar on hybrid annuity mode.
Read more4 lane with paved shoulders from design ch. 89.900-ch.136.100 in belgaum-hungund-raichur section of nh748a in the state of karnataka on hybrid annuity mode under nh(o) (project length 46.200 kms) pkg-3
4 lane with paved shoulders from design ch. 89.900-ch.136.100 in belgaum-hungund-raichur section of nh748a in the state of karnataka on hybrid annuity mode under nh(o) (project length 46.200 kms) pkg-3
Read moreNhidcl/assam /nh-37,08/sil-ch/pkg-iv/
Four laning of badarpur - churaibari section of nh-37 and nh-8 from design chainage 38.600 (end of proposed badarpur bypass) to km. 62.800 (start of proposed nilambazar cheragi bypass) in the state of assam (package-iv) on hybrid annuity mode.
Read moreof your Industry type