Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constt Of Lane With Tiles From Shop Of Gh Mohiud Din Dar To Onwards At Bathnoor
|
| Description |
Constt Of Lane With Tiles From Shop Of Gh Mohiud Din Dar To Onwards At Bathnoor
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_230079_23 |
|
Reference Number |
e- NIT No. 126/2023-24 Dated 16-09-2023 |
| Tender Fee | 200 |
| EMD | 4000 |
| Tender Value | |
| Place | Executive Engineer REW Pulwama |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | September 17, 2023 00:25 |
| End Date |
Expired
25/09/2023
Expired 1010 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Macadamization of road from khurmang to leeran km 3rd to onwards
Macadamization of road from khurmang to leeran km 3rd to onwards
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreRenovation of washroom and fixing of tiles at corridor at ecmu department adjacent to dy. se office chamber in iit (ism) dhanbad.
Renovation of washroom and fixing of tiles at corridor at ecmu department adjacent to dy. se office chamber in iit (ism) dhanbad.
Read moreImprovement of pathways at amit pan bidi shop to annapurna society at samta nagar in beat no.152 chembur in m/west ward.
Improvement of pathways at amit pan bidi shop to annapurna society at samta nagar in beat no.152 chembur in m/west ward.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConcession to supply install test commission and operate automated vehicle parking management system collection of parking fees and lane pickup fees rights at silchar airport
Concession to supply install test commission and operate automated vehicle parking management system collection of parking fees and lane pickup fees rights at silchar airport
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreCombined execution agency for facility development for upgradation of bitumen grade from vg-30 to vg-40 at haldia refinery including liaisoning with ibr authority
Combined execution agency for facility development for upgradation of bitumen grade from vg-30 to vg-40 at haldia refinery including liaisoning with ibr authority.
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreof your Industry type