Tender Details
Particulars | Details |
---|---|
Title |
Work Of Aerial Ofc Laying, Partial And Complete Rehabilitation Of Ofc Route Through Overhead Ofc Laying Method In Uttarakhand Circle
|
Description |
Work Of Aerial Ofc Laying, Partial And Complete Rehabilitation Of Ofc Route Through Overhead Ofc Laying Method In Uttarakhand Circle
|
Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
Tender Id | 2025_BSNL_236125_1 |
Reference Number |
Work of Aerial OFC Laying, partial and complete rehabilitation of OFC route through overhead OFC |
Tender Fee | 2950 |
EMD | 6 Lakh |
Tender Value | |
Place | Uttarakhand |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=267827 |
Start Date | May 23, 2025 18:30 |
End Date |
12/06/2025 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreAAAAAAAAAA
Login to viewBalance work of rehabilitation and up-gradation of section from km 206.00 to km 239.445 (nimbutala to austin creek) of nh-04 in a n islands on epc basis (pkg-iv) at the risk and cost of existing epc contractor, on percentage rate basis in fy 25-2
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read morePerformance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Read moreof your Industry type